Answer:
public static void updateRadius(Circle circle, int radius){
circle.setRadius(radius);
}
Explanation:
Assuming there is a class called Circle which has a method "setRadius", the void function "updateRadius" accepts two arguments namely circle class and the integer radius variable. The setRadius() method of the circle class is used to update the radius of the circle object.
A time-dependent action is placed in the workflow queue when the record is created. When will the action be removed from the queue? Choose 2 answers.
Complete Question:
A time-dependent action is placed in the workflow queue when the record is created. When will the action be removed from the queue? Choose 2 answers.
Group of answer choices.
A. When another record triggers the same workflow rule
B. When the action is deleted from the workflow queue.
C. When a validation rule is triggered for the record
D. When the record no longer matches the rule criteria.
Answer:
B. When the action is deleted from the workflow queue.
D. When the record no longer matches the rule criteria.
Explanation:
Workflow management systems can be defined as a strategic software application or program designed to avail companies the infrastructure to setup, define, create and manage the performance or execution of series of sequential tasks, as well as respond to workflow participants.
Some examples of workflow management systems used around the world are YAWL, Windows Workflow Foundation, Apache ODE, Collective Knowledge, Workflow Gen, PRPC, Salesforce.com, jBPM, Bonita BPM etc.
Time-dependent actions are actions that are executed at a specific period of time before the close-date of a database record.
Generally, a time-dependent action is placed in the workflow queue when the record is created. Therefore, the action will be removed from the queue under the these two (2) conditions;
I. When the action is deleted from the workflow queue.
II. When the record no longer matches he rule criteria.
3n - 12 = 5n - 2
how many solutions?
You respond to a fire at a pharmaceutical production plant. One of the outside storage tanks is on fire. The placard on the tank shows the ID number is 1053. What is this material?
Answer:
Hydrogen sulfide.
Explanation:
Hydrogen sulfide is a chemical compound formed due to the reaction of hydrogen and sulfur. It is a colorless, corrosive, poisonous and highly flammable gas having the foul smell of rotten eggs.
Under the United Nations/North America number datasheet, the identification number for hydrogen sulfide is 1053.
In this scenario, you respond to a fire at a pharmaceutical production plant. One of the outside storage tanks is on fire. The placard on the tank shows the ID number is 1053. Therefore, this material is hydrogen sulfide.
Fix the code so that the list of elements that end with "e".
// //Q2: Create a list of elements that end with the letter "e"
// //Hint: The last index item is always length-1
var nameElementE = [];
for (var i = 0; i < nameElement.length; i++) {
if (nameElement[i].substring(0,1)=="E"){
appendItem(nameElementE, nameElement[i]);
}
}
console.log(nameElementE);
// //Console.log out your final list
Answer:
It's
B
Explanation:
Sarah is a detail-oriented programmer. While testing her program, what other skill would she have to apply in order to detect all bugs?
A.
troubleshooting
B.
business skills
C.
managerial skills
D.
concentration
E.
time management
Answer:
A. troubleshooting
Explanation:
Troubleshooting is the process of trying to detect problems with a software or hardware component so as to apply solutions to it.
Therefore, Sarah would need troubleshooting skills to help her test her program to detect all bugs and fix it.
Question #1
Dropdown
What is the value of the totalCost at the end of this program?
quantity = 5
cost = 3
totalCost = quantity * cost
totalCost is
15
3
8
Answer:
the answer is 25
Explanation:
because ot is 25 due to the GB
The total cost when given cost as 3 and quantity as 5 is; 15
We are given;
Quantity = 5
Cost = 3
Now we are told that formula for the total cost is;
Total Cost = quantity × cost
Plugging in the given values of quantity and cost gives us;
Total Cost = 5 × 3
Total cost = 15
In conclusion, the total cost from the values of quantity and individual cost we are given is 15
Read more about total cost at;https://brainly.com/question/2021001