How do you develop a work breakdown structure? a) Assign tasks to each team member b)Divide the project deliverables into tasks c) combine the tasks into work packages d) List the tasks in order of completion.

Answers

Answer 1

The correct way to develop a work breakdown structure is by dividing the project deliverables into tasks, combining the tasks into work packages, and listing the tasks in order of completion.

What is a work breakdown structure?

A work breakdown structure is a technique for decomposing a large project into smaller, more manageable parts known as work packages. It aids in organizing work into manageable segments and developing a hierarchical breakdown of deliverables and activities that must be completed to achieve the project goals.

To develop a work breakdown structure, you need to take the following steps:

1: Define the project's major deliverables and objectives and create a rough project scope. The scope should explain the project's objectives, constraints, assumptions, and requirements.

2: Divide the project deliverables into tasks. By subdividing the deliverables into smaller parts, you can make them more manageable and reduce the risk of errors.

3: Combine the tasks into work packages. Work packages are groups of related tasks that are often performed by the same team or person. These packages should be self-contained and completed in a single time period.

4: List the tasks in order of completion. You can now arrange the tasks in order of completion once they have been divided into manageable parts. This will help you to track progress and make sure that all work packages are completed within the specified time frame and budget.

Therefore, the correct answer is all of the above.

Learn more about work breakdown structure here: https://brainly.com/question/30087262

#SPJ11


Related Questions

Discuss the vaccine value chain ecosystem in terms of the various entities, their motivations, the strengths they need to protect, and the potential contract requirements.

Answers

The vaccine value chain ecosystem can be described as a system that includes various entities, their motivations, the strengths they need to protect, and potential contract requirements that govern their relationships. This ecosystem is critical to the success of vaccine delivery, and it involves many different actors, including manufacturers, distributors, healthcare providers, and patients. Let's discuss each of these entities in more detail:

1. Manufacturers: Vaccine manufacturers are the key players in the vaccine value chain. They invest heavily in research and development to produce vaccines that are safe and effective. Manufacturers' primary motivation is to produce vaccines that meet regulatory requirements and deliver them at a reasonable cost. Their strengths are their ability to develop and produce vaccines at scale, as well as their ability to innovate and adapt to changing needs.

2. Distributors: Distributors are responsible for getting vaccines from the manufacturers to healthcare providers. They must ensure that vaccines are stored and transported correctly to maintain their effectiveness. Their motivation is to deliver vaccines on time and at the right price. Distributors' strengths include their ability to manage logistics and their knowledge of local markets.

3. Healthcare Providers: Healthcare providers play a crucial role in the vaccine value chain by administering vaccines to patients. Their motivation is to provide the best possible care to their patients. Providers' strengths are their expertise in patient care and their ability to deliver vaccines safely and effectively.

4. Patients: Patients are the ultimate beneficiaries of vaccines. They have a vested interest in receiving vaccines that are safe and effective. Patients' strengths are their willingness to receive vaccines and their ability to follow healthcare providers' instructions.

In conclusion, the vaccine value chain ecosystem is a complex system that includes many different actors, each with their motivations, strengths, and potential contract requirements. By working together, these entities can ensure that vaccines are delivered safely and effectively to those who need them.

Know more about ecosystem :

https://brainly.com/question/33703786

#SPJ11

check my
TB 18-226 The Friendly Bank offers AB United a $200,00...
The Friendly Bank offers AB United a $200.000 line of credit with an interest rate of 2.25% per quarter. The credit line also requires that 2% of the unused portion of the credit line be deposited in a non-interest bearing account as a compensating balance. AB United's short-term investments are paying 1.5% per quarter. What is the effective annual interest rate on this arrangement if the line of credit goes unused all year? Assume any funds borrowed or ingested use compound Interest
Multiple Choice
6.19%
6.08%

Answers

The effective annual interest rate on this arrangement is 3% ,  if the line of credit goes unused all year .

To calculate the effective annual interest rate on the arrangement, we need to consider both the interest rate on the line of credit and the compensating balance requirement.

First, let's calculate the interest expense on the line of credit. The interest rate is 2.25% per quarter, so the annual interest rate on the line of credit would be 4 times that amount:

Annual interest rate on line of credit = 2.25% × 4

                                                            = 9%

Next, let's calculate the interest earned on the compensating balance. The required compensating balance is 2% of the unused portion of the credit line. Since the credit line goes unused all year, the entire $200,000 is unused. Therefore, the compensating balance would be:

Compensating balance = 2% × $200,000

                                         = $4,000

The interest earned on the compensating balance is 1.5% per quarter, so the annual interest rate on the compensating balance would be 4 times that amount:

Annual interest rate on compensating balance = 1.5% × 4 = 6%

To calculate the effective annual interest rate, we need to consider the net effect of the interest expense on the line of credit and the interest earned on the compensating balance. We subtract the interest earned on the compensating balance from the interest expense on the line of credit:

Effective annual interest rate = Annual interest rate on line of credit - Annual interest rate on compensating balance

= 9% - 6%

= 3%

Therefore, the effective annual interest rate on this arrangement is 3%. None of the options provided in the multiple-choice answers match the correct answer.

Learn more about interest rate :

brainly.com/question/28499836

#SPJ11

Sugar Skull Corporation uses no debt. The weighted average cost of capital is 7.9 percent. If the current market value of the equity is $15.6 million and there are no taxes, what is EBIT? (Do not round intermediate calculations and enter your answer in dollars, not millions of dollars, e.g. 1,234,567.

Answers

The bond equivalent yield (BEY) can be calculated using the following formula:BEY = (Discount / Price) * (365 / Days to Maturity)

Given that the Treasury bill is quoted at 91.074 and has 118 days to maturity, we can substitute these values into the formula:

BEY = (100 - 91.074) / 91.074 * (365 / 118)

Calculating the numerator:

Discount = 100 - 91.074 = 8.926

Calculating the denominator:

Price = 91.074

Days to Maturity = 118

BEY = (8.926 / 91.074) * (365 / 118)

Now, let's calculate the BEY:

BEY = (0.097982) * (3.0898)

BEY ≈ 0.3020

Finally, we can convert the decimal to a percentage: BEY ≈ 30.20% Therefore, the percentage bond equivalent yield for the Treasury bill with 118 days to maturity quoted at 91.074 is approximately 30.20%.

Learn more about yield here:

https://brainly.com/question/30081101

#SPJ11

How might substitutes for labor such as automation and artificial
intelligence impact employment in certain industries

Answers

Substitutes for labor like automation and artificial intelligence can lead to job displacement in certain industries as tasks are automated, but can also create new job opportunities.

Substitutes for labor such as automation and artificial intelligence have the potential to impact employment in certain industries. With advancements in technology, tasks previously performed by humans can be automated, leading to job displacement. This can particularly affect industries that rely heavily on repetitive or routine tasks. However, it's important to note that automation and AI can also create new job opportunities. As technology evolves, new roles and skill requirements emerge, leading to the need for a different set of workforce skills. Industries involved in developing, implementing, and maintaining these technologies may experience growth in employment. Additionally, automation can enhance productivity, efficiency, and innovation, which can positively impact overall economic growth and potentially lead to job creation in other areas. The net effect on employment will depend on various factors, including the pace of technological advancement, workforce adaptability, and proactive policies to address potential job displacement and upskill workers.

learn more about industries here:

https://brainly.com/question/28495859

#SPJ11

17. (2.0) When the actual change in the price level differs from its expected change, which of the following can explain why firms. might change their production? A B C both menu costs and mistaking a

Answers

When the actual change in the price level differs from its expected change, menu costs and mistaking a price level change for a change in relative prices can explain why firms might change their production. The correct answer is option B.

What is menu cost?

Menu costs are the expenses incurred by firms in order to change their prices in response to changes in economic conditions. Menu costs include the cost of printing new menus, the cost of reprogramming digital signage, and the cost of re-pricing goods. Furthermore, menu costs can influence the behavior of suppliers and the economy in general.

What is mistaking a price level change for a change in relative prices?

Mistaking a price level change for a change in relative prices happens when producers of a particular product believe that the price of their product has risen, when in reality, the price of all other goods and services has risen and the price of their product has remained constant. As a result, the producers increase the production of their product, believing that it is in higher demand, only to find that the demand for their product is the same.

What can explain why firms might change their production?

When the actual change in the price level differs from its expected change, menu costs and mistaking a price level change for a change in relative prices can explain why firms might change their production.

Hence, the correct answer is option B.

The complete question must be:

When the actual change in the price level differs from its expected change, which of the following can explain why firms might change their production?

a. both menu costs and mistaking a price level change for a change in relative prices

b. menu costs but not mistaking a price level change for a change in relative prices

c. mistaking a price level change for a change in relative price but not menu costs

d. neither menu costs nor mistaking a price level change for a change in relative prices

To know more about price level , visit https://brainly.com/question/30101673

#SPJ11

Which of the following statements are correct on Gaps?
i.Gaps on intraday charts are always filled.
ii.Gaps on all charts are usually filled.
iii.Gaps are more common on weekly than daily charts.
iv.Gaps are more common on intraday than daily charts.
A.i and iv
B.ii and iv
C.i and iv
D i and iii

Answers

Gaps refer to areas on a chart where there is a sudden price movement with little to no trading in between. They are created when a market opens above or below the previous day's closing price, resulting in a gap on the chart. The following statements are correct on gaps: D i and iii.

Let's explore these statements in more detail:

i. Gaps can occur in both bullish and bearish trends: Gaps can occur in any type of market, whether it's bullish or bearish. They usually represent a sudden shift in market sentiment and can be an indicator of the strength of the trend.

iii. There are four types of gaps: Common gaps, breakaway gaps, runaway gaps, and exhaustion gaps. Each type of gap represents a different scenario in the market and can provide valuable information to traders.

Common gaps occur within a trend and do not indicate a change in market sentiment. Breakaway gaps occur at the beginning of a trend and can indicate the start of a new trend. Runaway gaps occur in the middle of a trend and can signal a continuation of the trend. Exhaustion gaps occur at the end of a trend and can indicate that the trend is losing momentum.

In conclusion, the statements D i and iii are correct on gaps. Gaps can occur in any type of market, and there are four types of gaps, each representing a different scenario in the market and can provide valuable information to traders.

To know more about price movement, refer to the link:

https://brainly.com/question/32174200?#

#SPJ11

Valuing an American Option J&B Drilling Company has recently acquired a lease to drill for natural gas in a remote region of southwest Louisiana and southeast Texas. The area has long been known for oil and gas production, and the company is optimistic about the prospects of the lease. The lease contract has a three-year life and allows J&B to begin exploration at any time up until the end of the three-year term.
J&B’s engineers have estimated the volume of natural gas they hope to extract from the leasehold and have placed a value of $25 million on it, on the condition that explorations begin immediately. The cost of developing the property is estimated to be $23 million (regardless of when the property is developed over the next three years). Based on historical volatilities in the returns of similar investments and other relevant information, J&B’s analysts have estimated that the value of the investment opportunity will evolve over the next three years, as shown in the figure on page 485. The risk-free rate of interest is currently 5%, and the risk-neutral probability of an uptick in the value of the investment is estimated to be 46.26%.
Evaluate the value of the leasehold as an American call option. What is the lease worth today?
As one of J&B’s analysts, what is your recommendation about when the company should begin drilling

Answers

The value of the leasehold as an American call option today is approximately $17.312 million.

To evaluate the value of the leasehold as an American call option, we need to compare the expected payoff from exercising the option at each point in time with the cost of developing the property.

Given the information provided, the value of the investment opportunity evolves over the next three years. We can calculate the present value of the expected payoffs at each stage and determine the optimal exercise strategy.

The risk-neutral probability of an uptick in the value of the investment is 46.26%, which means there is a 46.26% chance of the investment being successful and reaching a value of $25 million. The risk-free rate of interest is 5%.

Using a backward induction approach, we can calculate the present value of the expected payoffs at each time period.

At year 3, the expected payoff from exercising the option is $25 million, as the leasehold value reaches its maximum potential. Discounting this amount back to the present, we get:

PV3 = $25 million / (1 + 5%)^3 ≈ $21.646 million.

At year 2, the expected payoff from exercising the option is the maximum between $21.646 million (continuing to year 3) and $0 (deciding not to drill). Discounting this amount back to the present, we get:

PV2 = max($21.646 million, $0) / (1 + 5%)^2 ≈ $18.138 million.

At year 1, the expected payoff from exercising the option is the maximum between $18.138 million (continuing to year 2) and $0 (deciding not to drill). Discounting this amount back to the present, we get:

PV1 = max($18.138 million, $0) / (1 + 5%)^1 ≈ $17.312 million.

Therefore, the value of the leasehold as an American call option today is approximately $17.312 million.

As an analyst, the recommendation about when the company should begin drilling depends on the cost of development. If the cost of development is less than or equal to $17.312 million, it would be optimal to begin drilling immediately and exercise the option. However, if the cost of development exceeds $17.312 million, it may be better to delay drilling and reassess the situation in the following years, considering the evolving value of the leasehold and the potential for higher returns.

learn more about American Call here:

https://brainly.com/question/6058787

#SPJ11

What did you learn from writing the assignments in this course business intelligence and emerging technologies and why do you think I made
them so different from the lecture material (No, it is not to mess with you)? (20 Marks

Answers

I can provide you with some insights on what students typically learn from writing assignments in a course on business intelligence and emerging technologies and why assignments may differ from lecture material:

1. Deeper Understanding: Writing assignments allows students to delve deeper into the course material and develop a more comprehensive understanding of the concepts. By researching, analyzing, and synthesizing information, students gain a more thorough grasp of the topics covered in the course.

2. Application of Knowledge: Assignments provide an opportunity to apply the knowledge gained from lectures and readings to real-world scenarios or problem-solving exercises. This helps students bridge the gap between theory and practice and enhances their critical thinking and problem-solving skills.

3. Independent Learning: Assignments encourage independent learning as students are required to explore additional resources, conduct research, and think critically to complete the tasks. This promotes self-directed learning and empowers students to take ownership of their education.

4. Integration of Multiple Perspectives: Assignments often require students to explore different perspectives, theories, or case studies related to the course topics. This allows students to gain a broader understanding of the subject matter by considering various viewpoints and integrating diverse sources of information.

5. Enhancing Communication Skills: Writing assignments helps students improve their written communication skills. They learn how to articulate their thoughts clearly, structure their ideas logically, and present their arguments effectively. These skills are essential for professional success in various fields.

As for why assignments may be different from the lecture material, several factors could contribute to this:

1. Application-oriented Focus: Assignments may focus more on practical applications and real-world scenarios to prepare students for future challenges in the field. This may involve exploring emerging technologies, analyzing case studies, or engaging in hands-on projects, which may not be extensively covered in lectures.

2. Additional Research: Assignments often require students to conduct independent research beyond what is covered in lectures. This allows students to explore current trends, emerging technologies, or recent developments in the field, thereby expanding their knowledge beyond the scope of the lecture material.

3. Customization for Learning Outcomes: Assignments may be designed to align with specific learning outcomes or course objectives. They may be tailored to assess specific skills or competencies that are essential for the subject matter, encouraging students to demonstrate their understanding, critical thinking, problem-solving, or analytical abilities.

4. Application of Diverse Perspectives: Assignments may incorporate diverse perspectives, theories, or approaches to provide a comprehensive understanding of the subject matter. This encourages students to think critically and consider multiple viewpoints, which may not be extensively covered in lectures.

Overall, the intention behind designing assignments differently from lecture material is to provide a well-rounded learning experience that combines theoretical knowledge with practical application, independent research, critical thinking, and effective communication skills development.

Learn more about business intelligence

brainly.com/question/30456425

#SPJ11

5. You purchase your daily
coffee at the chemist’s coffeehouse and have a choice of two cups
with different specific heat capacity. Which cup will you choose,
the cup with a low specific or the cu

Answers

You would choose the cup with a low specific heat capacity.

Specific heat capacity refers to the amount of heat energy required to raise the temperature of a substance by a certain amount. In the context of coffee cups, a cup with a low specific heat capacity means that it heats up or cools down quickly in response to changes in temperature.

When you purchase your daily coffee, you likely want to enjoy it at an optimal temperature for a longer period. By choosing a cup with a low specific heat capacity, it will absorb less heat from the coffee, allowing it to stay hot for a longer time. The cup will also cool down faster when exposed to the surrounding environment, preventing your coffee from becoming lukewarm too quickly.

On the other hand, a cup with a high specific heat capacity would absorb more heat from the coffee, causing it to cool down rapidly. This would result in your coffee becoming cold faster, making it less enjoyable to drink.

Therefore, opting for a cup with a low specific heat capacity would be more advantageous as it helps maintain the desired temperature of your coffee for a longer duration.

Learn more about : Specific heat capacity

brainly.com/question/28302909

#SPJ11

Which of the following is NOT an example of a post-processing
techniques used by photographers to change the appearance of an
image?
A. Dodging
B. Selection of subject matter
C. Layering
D. Cropping

Answers

Selection of subject matter is not an example of a post-processing technique used by photographers to change the appearance of an image. Post-processing techniques refer to the adjustments and enhancements made to an image after it has been captured.

Dodging is a technique used to selectively lighten certain areas of an image, while burning is used to darken specific areas. Layering involves combining multiple images or elements to create a composite. Cropping involves removing unwanted parts of an image to improve composition or focus on a specific subject.

On the other hand, the selection of subject matter is a decision made before capturing the image. It refers to choosing what to photograph and how to frame the subject, which occurs during the pre-processing stage rather than during post-processing.

Learn more about post-processing here:

https://brainly.com/question/15401975

#SPJ11

If the exchange rate changes from $1.06 per euro to $1.10 per euro, then the has become stronger relative to the When the dollar becomes stronger in value, this will exports to Europe and imports from Europe.

Answers

If the exchange rate changes from $1.06 per euro to $1.10 per euro, then the dollar has become stronger relative to the euro. When the dollar becomes stronger in value, this will reduce exports to Europe and increase imports from Europe

We can explain how changes in currency exchange rates affect trade and the global economy.

When a country's currency appreciates relative to other currencies, its exports become more expensive and its imports become cheaper. This results in a reduction in the country's exports and an increase in its imports. When a currency depreciates, the opposite occurs; exports become cheaper and imports become more expensive. This can lead to an increase in exports and a decrease in imports.

As an example, when the exchange rate changes from $1.06 per euro to $1.10 per euro, the dollar has become stronger relative to the euro. This means that U.S. goods become more expensive for European buyers, which will reduce exports to Europe.

At the same time, European goods become cheaper for U.S. buyers, which will increase imports from Europe.

learn more about exchange rate  here:

https://brainly.com/question/32344536

#SPJ11

Using the Rose article:
What are the trades-offs for Value Managers vs. Market Managers?
Why do boards of directors sometimes make decisions that emphasize legal defensibility at the expense of personal ethics and social responsibility

Answers

Value managers and market managers differ in their trading philosophies. Value managers are looking for companies that are undervalued by the market, while market managers are looking for companies that are growing quickly and have a positive story to tell about their future. Value managers are more conservative and focus on stocks with a low price-to-earnings ratio, while market managers are more aggressive and seek high-growth companies with high price-to-earnings ratios.

The trade-offs for Value Managers vs. Market Managers are as follows:

Value managers have a long-term investing philosophy. Market managers have a short-term investing philosophy. Value managers invest in stocks that are out of favor in the market. Market managers invest in stocks that are popular in the market. Value managers are more conservative and seek a margin of safety. Market managers are more aggressive and seek to maximize returns.

Boards of directors sometimes make decisions that emphasize legal defensibility at the expense of personal ethics and social responsibility because they are attempting to protect themselves from legal liability. They are concerned about the possibility of being sued and are attempting to protect themselves from liability. This is often done at the expense of ethical considerations and social responsibility, as the primary concern is avoiding legal liability. In some cases, boards of directors may be more concerned about their interests than those of the company or its stakeholders. This can lead to decisions that are not in the best interests of the company or its stakeholders.

Learn more about Value Managers and Market Managers-

https://brainly.com/question/24553900

#SPJ11

Record this transaction: The Fed buys $5 in securities from
banks. This transaction _________ (increases / decreases) the money
creating potential of the banking system by $_____ billion.

Answers

The given transaction states that the Federal Reserve buys $5 in securities from banks. Such a transaction increases the money-creating potential of the banking system by $5 billion.

Here’s how the transaction works:

When the Federal Reserve buys securities from banks, it is essentially injecting new money into the banking system. Banks then have more money to lend to businesses and individuals, which in turn can increase spending and investment in the economy.

The increase in lending power also increases the money-creating potential of the banking system. Banks can now lend out more money than they previously could, which in turn can create more money in the economy through the process of fractional reserve banking. This is because banks are required to hold only a portion of their deposits in reserve, while the rest can be lent out to borrowers.

This creates a cycle of lending and spending that can lead to economic growth and expansion.

In conclusion, the given transaction increases the money-creating potential of the banking system by $5 billion. The Fed buys securities from banks to inject more money into the economy, which in turn increases lending and spending power of the banks.

To learn more about Federal Reserve click here:

https://brainly.com/question/25817380#

#SPJ11

(a) Identify each of the following cash flow to indicate whether it is a benefit, a disbenefit, or a cost. (i) A project manager is constructing a large water dam but incurs a budget shortage. Hence he purchases less expensive turbines with a shorter maintenance cycle. The end result is less project cost, but higher operating cost. ( 1 mark) (ii) The project manager purchased less expensive turbines with a shorter maintenance cycle. (1 mark) (iii) Protect wetlands and introduce plant trees strategically is one way to prevent flash flood (1 mark) (iv) The replacement of brake pads that reaches the end of its useful life is part of a routine of maintaining a car. ( 1 mark) (v) Too much exposure to the UV light for skin treatment may well triggered the pigmentation of the skin. ( 1 mark)

Answers

a) Benefits, disBenefits, and costs are three types of cash flows that determine a project's viability.

Following are the categories that each of the cash flows belongs to:

(i) DisBenefit: A project manager purchases less expensive turbines with a shorter maintenance cycle due to a budget shortfall. The result is a reduction in project expenses but an increase in operating costs.

(ii) Cost: The project manager has purchased less expensive turbines with a shorter maintenance cycle.

(iii) Benefit: Protecting wetlands and planting trees strategically is a good way to prevent flash floods.

(iv) Cost: Replacing worn brake pads is part of a car's routine maintenance.

(v) Disbenefit: Too much exposure to UV light for skin treatment can cause skin pigmentation to occur.

To know more about this :

https://brainly.com/question/31514618

#SPJ11

please show answer and how to get answer
Problem I Note: Unexplained answers will NOT be graded You own a building that you plan on leasing to a businessman for $60,000 per year for three years. You estimate the annual explicit cost and impl

Answers

Explicit costs are the ones which are easy to calculate, and it represents the monetary payment made by an organization for buying goods and services.

On the other hand, implicit costs are the ones which are not easy to calculate, and it represents the value of resources used by the organization for a certain activity such as the value of the owner's time or the opportunity cost of the resources utilized.

These costs can be determined using a formula as follows:Total cost = Explicit cost + Implicit costHere in the given problem, the building is being leased to a businessman for three years at $60,000 per year. Therefore, the explicit cost would be $60,000 x 3 = $180,000 for three years.

Now, to determine the implicit cost, it can be assumed that the opportunity cost of this building is $40,000 per year. It implies that if the building is not leased, then the owner would receive $40,000 per year. Therefore, the implicit cost of the building would be $40,000 x 3 = $120,000 for three years.

Substituting the explicit cost and implicit cost values in the formula, we have:Total cost = Explicit cost + Implicit cost= $180,000 + $120,000= $300,000Therefore, the total cost of leasing the building for three years would be $300,000.

To know more about Explicit costs  here

https://brainly.com/question/13599226

#SPJ11

What is the rationale of government intervention in trade? (5
marks)
Economic
Non- Economic

Answers

Government intervention in trade can be driven by both economic and non-economic rationales. Here's a breakdown of each rationale:

Economic Rationales: Protection of Domestic Industries: Governments may intervene in trade to protect domestic industries from foreign competition. Tariffs, quotas, and other trade barriers can be implemented to shield domestic industries from unfair competition or to allow them to develop and grow. Strategic Industries and National Security: Governments may intervene in trade to safeguard strategic industries vital to national security or economic stability. These industries could include defense, energy, telecommunications, or critical infrastructure sectors. Correcting Market Failures: Governments may intervene in trade to address market failures.

learn more about :- Government intervention  here

https://brainly.com/question/26489734

#SPJ11

How much will Maria and Raul have to deposit each month into an annuity that earns 4.5%, if they want to have $40,000.00 in 10 years?
Assume the interest rate does not change while the account is open. Round your final answers to the nearest cent.
How much interest, in total, will they earn?

Answers

Amount to be invested (P) = $40,000.00 Interest rate (r) = 4.5% per annum Time (t) = 10 years We are to find how much Maria and Raul have to deposit each month into an annuity that earns 4.5%.

if they want to have $40,000.00 in 10 years We use the formula for monthly installment for an annuity which is given by, `EMI = P x r / (1 - (1 + r)^-n) `Where; P = Loan amount, r = interest rate, n = tenure, EMI = Equated Monthly Installment. To calculate the monthly payment.

we use the formula for the present value of an annuity: PV = P (1 - 1 / (1 + r)^n ) / r Where; PV = $40,000.00, P = Monthly payment, r = 4.5% per annum, n = 10 years (10 * 12 = 120 months) Substituting the values in the above formula;40,000 = P [1 - 1/(1 + 0.045/12)^(120)] / (0.045/12)P = 40,000 / (1 - (1.00375)^-120) / 0.00375P = $287.15.

Know more about invested:

https://brainly.com/question/10908938

#SPJ11

URGENT HELP PLEASE!
Suppose that Eva and Jarod are thinking about trading plums and bananas at the local farmers .25,.5 market. Eva has the following utility function u(p, b) pb and Jarod has the following utility functi

Answers

In this scenario, Eva and Jarod are considering trading plums and bananas at a local farmer's market. Eva's utility function is u(p, b) = pb, while Jarod's utility function is u(p, b) = 2pb. Both utility functions assume that more is better for both plums and bananas.

Let's break this down.Eva's Utility Function Eva's utility function can be broken down as follows:u(p, b) = pbWhere p represents the number of plums and b represents the number of bananas. Eva's utility function indicates that the more plums and bananas she has, the happier she is.

If Eva's marginal utility for bananas is greater than her marginal utility for plums, she will want to trade her bananas for plums. In other words, Eva will trade bananas for plums if the exchange rate is higher than the ratio of her marginal utilities for bananas and plums.

If Eva is trading plums for bananas, she will want to trade plums for bananas if the exchange rate is lower than the ratio of her marginal utilities for plums and bananas. Jarod's Utility FunctionJarod's utility function can be broken down as follows:u(p, b) = 2pbJust like Eva, Jarod's utility function assumes that more is better for both plums and bananas. However, unlike Eva's utility function, Jarod's marginal utility for bananas is twice that of plums.

Therefore, if Jarod is trading bananas for plums, he will want to trade bananas for plums if the exchange rate is lower than the ratio of his marginal utilities for bananas and plums. If Jarod is trading plums for bananas, he will want to trade plums for bananas if the exchange rate is higher than the ratio of his marginal utilities for plums and bananas.

To know more about trading plums here

https://brainly.com/question/29025370

#SPJ11

Price (dollars) 8 7 6 5 4 3 4 5 6 7 Using the demand schedule in the above table, if the firm's marginal cost is constant at $3.00, output for a perfectly price discriminating monopolist is 3 2 3 unit

Answers

To determine the output level for a perfectly price discriminating monopolist:

We need to compare the marginal cost with the price at each quantity demanded. The monopolist would produce the quantity where the marginal cost equals the corresponding price in order to maximize profits.

Given that the marginal cost is constant at $3.00, we can compare it with the prices in the demand schedule:

At a price of $8, the marginal cost is lower than the price, so the firm would produce more than 3 units.

At a price of $7, the marginal cost is lower than the price, so the firm would produce more than 2 units.

At a price of $6, the marginal cost is equal to the price, so the firm would produce 3 units.

At a price of $5, the marginal cost is higher than the price, so the firm would produce 2 units.

Therefore, the output level for a perfectly price discriminating monopolist with a constant marginal cost of $3.00 would be 3 units at a price of $6 and 2 units at a price of $5.

More on marginal cost: https://brainly.com/question/17230008

#SPJ11

B) The change in multifactor productivity if Eiskaffee is added to
the menu is __%
C) If everything else remains unchanged, how many units of
Eiskaffee would have to be sold to ensure that the multifa
Harald Luckerbauer, the manager at Morning Brew Coffee Shop, would like to understand how adding Eiskaffee (a German coffee beverage of chilled coffee, milk, sweetener, and vanilla ice cream) will alt

Answers

The output will increase with the addition of Eiskaffee, while the total labor and capital will remain constant. The Morning Brew Coffee Shop must sell an additional 200 units of Eiskaffee to ensure that the MFP increases by 5%. The answer is 200 units.

Harald Luckerbauer, the manager of Morning Brew Coffee Shop, is considering adding Eiskaffee to the menu. The addition of Eiskaffee will bring about changes in the shop's multifactor productivity (MFP).

Let us answer the given questions: The change in multifactor productivity (MFP) if Eiskaffee is added to the menu can be calculated as follows:

MFP = Output / (Labor + Capital). The output will increase with the addition of Eiskaffee, while the total labor and capital will remain constant. Therefore, the MFP will increase. The exact percentage change in the MFP cannot be determined without additional information.

To ensure that the MFP increases by 5%, we can use the following formula: 5% = (ΔOutput / Output) - (ΔLabor / Labor) - (ΔCapital / Capital).

Since everything else remains unchanged, the ΔLabor and ΔCapital will be equal to zero. We can rearrange the formula as follows:

ΔOutput / Output = 5%.

Therefore, we can calculate the required increase in output as:

ΔOutput = Output * 5%ΔOutput = 4000 * 5%ΔOutput = 200 units. The Morning Brew Coffee Shop must sell an additional 200 units of Eiskaffee to ensure that the MFP increases by 5%. The answer is 200 units.

Learn more about capital here :

https://brainly.com/question/29608710

#SPJ11

1. Name one positive and one negative externality. Distinguish between commandand-control policies vs market policies giving examples and definitions of each. What are downsides of control policies?

Answers

An externality is a side effect of a product or activity on parties who didn't choose to incur that effect. Externalities are classified into positive externalities and negative externalities.

Positive externality: A positive externality is a beneficial effect that an activity imposes on an unrelated third party. For instance, an individual who plants a tree in their yard creates a positive externality because the tree removes carbon dioxide from the atmosphere, providing benefits to everyone.

Negative externality: A negative externality is a detrimental effect that an activity imposes on an unrelated third party. For instance, manufacturing can create pollution that harms the environment and affects people's health. Command-and-control policies and market policies Command-and-control policies and market policies are the two most common forms of government intervention in markets to address externalities.

Command-and-control policies: The government specifies the amount of pollution that businesses are permitted to emit under a command-and-control policy. For example, the United States Clean Air Act mandates that industrial factories emit no more than a certain amount of pollutants. This approach has the benefit of being direct and straightforward but can be expensive and inflexible.

Market-based policies: This type of policy creates financial incentives to encourage businesses to reduce pollution. The most popular market-based policies are cap-and-trade schemes and pollution taxes. Cap-and-trade mechanisms restrict the amount of pollution that businesses can generate while permitting them to exchange pollution credits with one another. Pollution taxes are charges on businesses for each unit of pollution they produce. Market-based policies are more cost-effective and adaptable than command-and-control policies. Disadvantages of command-and-control policies

The following are the downsides of control policies:

Command-and-control policies are often inflexible and uniform, which might lead to inefficiencies. They don't account for differences in environmental impact caused by varying manufacturing procedures, which may result in unnecessary expenses for some firms. Command-and-control policies may place a heavy administrative burden on governments, especially those that must monitor a large number of businesses. This may be costly and time-consuming.  Command-and-control policies may stifle innovation and technological advancement. Instead of attempting to reduce pollution, businesses may focus their efforts on meeting regulatory requirements, thereby failing to discover new methods of reducing pollution that may be less expensive and more environmentally friendly than current methods.

To know more about externality refer to:

https://brainly.com/question/14018373

#SPJ11

Pick two countries to compare using Hofstede's Dimensions, and tell me why the country's differences (or similarities) would be important when it comes to developing and implementing different HR policies. You only need to focus on one dimension, you don't need to explain all 5.

Answers

In comparing two countries using Hofstede's Dimensions, we will focus on the dimension of Individualism vs. Collectivism. Two countries that can be compared are the United States and Japan. The differences in individualism vs. collectivism between these countries are important when developing and implementing HR policies, as they influence employee expectations, decision-making processes, and teamwork.

The United States scores high on the dimension of Individualism, emphasizing individual goals, independence, and self-reliance. In contrast, Japan scores relatively low on individualism, reflecting a collective orientation with an emphasis on group harmony, loyalty, and cooperation.

These cultural differences have implications for HR policies. In the United States, HR policies may focus on individual recognition, rewards based on individual performance, and encouraging personal development.

On the other hand, in Japan, HR policies may emphasize teamwork, collective decision-making, and promoting harmony within the organization. Understanding these cultural differences helps organizations tailor their HR policies to align with the values and expectations of employees in each country, ensuring effective implementation and employee engagement.

Learn more about Hofstede's Dimensions:

brainly.com/question/33091902

#SPJ11

Question 2 Harney \& Sons (H\&S) Tea company is a luxury tea salon/tea shop that can be considered as one of the dominant monopoly firms in the luxury tea industry worldwide. The H\&S (as a monopolist

Answers

As a monopolist, Harney & Sons (H&S) Tea company has significant market power and is the sole provider of luxury tea in the industry.

Harney & Sons (H&S) Tea company operates as a monopoly in the luxury tea industry, meaning it has exclusive control over the supply of luxury tea products.

As a monopolist, H&S enjoys substantial market power, allowing it to set prices and output levels without direct competition. Being a dominant player in the luxury tea market worldwide, H&S faces limited or no competition from other firms.

This gives them the ability to influence market conditions and potentially earn economic profits in the long run.  By controlling the supply, H&S can determine the price of their luxury tea products, maximizing their revenue and capturing a larger share of consumer surplus.

However, as a monopolist, H&S may face challenges such as regulatory scrutiny and potential backlash from consumers due to limited choices and higher prices.

The absence of direct competition can also hinder innovation and efficiency in the long run. Overall, H&S's position as a monopolist gives it substantial control and influence in the luxury tea industry.

learn more about surplus here:

https://brainly.com/question/30622657

#SPJ11

The inverse demand for a homogeneous-product Stackelberg duopoly is P=18,000−5Q. The cost structures for the leader and the follower, respectively, are C L

(Q L

)=2,000Q L

and C F

(Q A

)=4,000Q F

. a. What is the follower's reaction function? Q F

=−Q L

b. Determine the equilibrium output level for both the leader and the follower. Leader output: Follower output: c. Determine the equilibrium market price. $ d. Determine the profits of the leader and the follower. Leader profits: \$ Follower profits: \$
Previous question
Next question

Answers

a. The follower's reaction function is Q F =30,000−5Q L.

b. Equilibrium output level for both the leader and the follower.

Leader output: 4,000 units Follower output: 10,000 unit sc.

Equilibrium market price is $8,000 per unit.

d. The profits of the leader and the follower.

Leader's profits: $24,000,000

Follower's profits: $16,000,000

We have given that the inverse demand equation of a homogeneous-product Stackelberg duopoly is

P = 18,000 - 5Q.

Let QL and QF be the quantities produced by the leader and the follower, respectively.

Cost for the leader: CL = 2,000QL.

Cost for the follower: CF = 4,000QF.

In a Stackelberg model, the leader chooses its quantity first, and the follower chooses its quantity later. Thus, the leader's decision is based on its expectation that the follower will choose its quantity according to its reaction function.

For the follower: dQF/dQL = -MC F/MR= -4000/-10 = 400.

The follower's reaction function is given by:

QF = 30,000 - 5QL.

b) The equilibrium output level for the leader and the follower.

Leader output:

The leader's profit is π L = TR L - C L  π L = (PQ L ) - C L  

π L = [18,000 - 5(Q L + Q F )]Q L - 2,000Q L  

π L = (18,000Q L ) - 5(Q L + Q F )Q L - 2,000Q L  

π L = 11,000Q L - 5Q L 2  

dπ L /dQ L = 11,000 - 10Q L= 0  Q L = 1,100 units

Follower output: From the reaction function, we can find QF as a function of QL.

Q F =30,000−5Q L = 30,000 - 5(1,100)= 24,000 units.

c) The equilibrium market price is found by substituting the values of QL and QF into the inverse demand function.  

P = 18,000 - 5QL  

P = 18,000 - 5(1,100)= $8,000 per unit

d) The profits of the leader and the follower. Leader's profits:  

π L = (PQ L ) - C L

π L = (8,000 × 1,100) - 2,000 × 1,100

π L = $24,000,000.

Follower's profits:  π F = (PQ F ) - C F  

π F = (8,000 × 24,000) - 4,000 × 24,000  

π F = $16,000,000.

To know more about market price refer to:

https://brainly.com/question/30165908

#SPJ11

Question 8 An investor buys a put option on Swiss francs with an exercise price of $0.863. At the time of the option expiration date, the spot price for Swiss francs was $0.859. This option is: O in the money
O out of the money

Answers

The option is in the money. The exercise price of $0.863 is higher than the spot price of $0.859, allowing the investor to sell Swiss francs at a higher price than the current market value. This gives the investor a profit if they choose to exercise the option.

The option is in the money because the exercise price of $0.863 is higher than the spot price of $0.859. In this scenario, the investor has the right to sell Swiss francs at a higher price than the current market value. Since the investor can sell the francs for more than they are worth, it is advantageous for them to exercise the option and make a profit.

Learn more about money here:

https://brainly.com/question/32960490

#SPJ11

When individuals perform predetermined activities by delegating responsibility and granting authority to their subordinates, they:
diminish their own power and authority.
diminish their own capability to get things done.
know a good performance by subordinates will be a threat to their own careers.
are still ultimately responsible for the results.

Answers

When individuals perform predetermined activities by delegating responsibility and granting authority to their subordinates, they are still ultimately responsible for the results.

Individuals delegating responsibility and granting authority to their subordinates are still ultimately responsible for the outcomes of the actions they delegate.

Delegation is a process where you give other people the responsibility of completing a task or action. It is a management technique that provides managers with the ability to assign tasks to their subordinates. Delegation allows managers to focus on strategic tasks while giving their subordinates the opportunity to grow and develop their skills.

Delegation should only be used when the manager is confident that the person they are delegating the task to has the appropriate level of expertise and knowledge to complete the task. Delegation is not about giving up responsibility, but about sharing it. The delegator remains accountable for the outcome of the action.

Learn more about delegation here: https://brainly.com/question/10708236

#SPJ11

Macroeconomics focuses on which of the following variables? household expenses for a single mother the profit earned by a business government spending the number of unemployed people in an economy D Question 2 Identify the two groups that do not interact in a circular flow diagram for a two-sector economy. Exporters Importers Businesses O Households 6.25 pts
Previous question

Answers

1.) Macroeconomics focuses on government spending and unemployment rates, examining their impact on economic growth, employment levels, income distribution, and overall economic health.

2.) Exporters and importers do not directly interact in a two-sector circular flow diagram as it only represents the flow of goods, services, and money between households and businesses within the domestic economy.

1.) Macroeconomics focuses on the variables of government spending and the number of unemployed people in an economy. Macroeconomics is concerned with studying the overall performance, structure, behavior, and decision-making of an economy as a whole. It analyzes aggregates such as national income, employment levels, inflation rates, and government policies that impact the entire economy.

One key variable that macroeconomists study is government spending, which includes expenditures on public goods and services, infrastructure development, welfare programs, and defense. Government spending plays a significant role in influencing economic growth, employment levels, and income distribution.

Another important variable in macroeconomics is the number of unemployed people in an economy.

Unemployment is a crucial indicator of economic health and reflects the unused labor resources in a country. Macroeconomists analyze unemployment rates, types of unemployment (such as cyclical, structural, or frictional), and the impact of unemployment on the overall economy.

Unemployment affects consumer spending, government revenues, and social welfare programs, making it an essential variable to study in macroeconomics.

In summary, the variables of government spending and the number of unemployed people are key focuses of macroeconomics.

2.) The two groups that do not interact in a circular flow diagram for a two-sector economy are exporters and importers.

In a two-sector economy, the circular flow diagram represents the flow of goods, services, and money between two main groups: households and businesses. Households supply factors of production, such as labor and capital, to businesses in exchange for income.

Businesses, in turn, produce goods and services, which they sell to households in exchange for revenue.

However, in this simplified two-sector model, there is no direct interaction or flow of goods, services, or money between exporters and importers.

Exporters are businesses that sell goods and services to foreign countries, generating export revenue for the domestic economy. Importers, on the other hand, are businesses that purchase goods and services from foreign countries, resulting in an outflow of money from the domestic economy.

While exporters and importers play important roles in the overall economy, their interactions occur outside the scope of the two-sector model. The circular flow diagram in this context focuses solely on the flow of economic activity between households and businesses within the domestic economy.
For more question on unemployment visit:

https://brainly.com/question/30403878

#SPJ8

Labu Labi Sdn Bhd closes its accounts annually on 31 December. On 3 May 2022, the company disposed of a company car for RM60, 000. The company acquired the car on a hire purchase basis on 1 July 2020 for RM200,000 for use by the managing director. The residual expenditure brought forward at 1 January 2022 was RM10,000. Required: Calculate the balancing adjustment which arises for Labu Labi Sdn Bhd on the disposal of the car on 3 May 2022 for the year of assessment 2022.

Answers

The accrued capital allowances and the sale revenues must be taken into account when calculating Labu Labi Sdn Bhd's balancing adjustment for the disposal of the car on May 3, 2022, for the assessment year 2022.

We begin by calculating the total capital allowances up to December 31, 2021. The car was purchased on 1 July 2020, hence the period from 1 July 2020 to 31 December 2021 will be covered by the capital allowances for the year of assessment 2021. The annual capital allowance, using a straight-line depreciation approach over five years, would be RM200,000 / 5 = RM40,000. As a result, there will be RM40,000 in total capital allowances up until December 31, 2021. We then figure out the balancing adjustment. The revenues from disposal total RM60,000, and the At the start of 2022, residual expenses were shifted forward by RM10,000. The discrepancy between the proceeds from disposal and the brought-forward residual expenditure makes up the balancing adjustment. Therefore, RM60,000 - RM10,000 = RM50,000 will be the balance adjustment. In conclusion, Labu Labi Sdn Bhd would incur an RM50,000 balance adjustment upon selling the vehicle on May 3, 2022, for the year of assessment 2022.

learn more about allowances here:

https://brainly.com/question/29043310

#SPJ11

develop an action plan on how you would eliminate potential
failure points.

Answers

To develop an action plan for eliminating potential failure points, it is important to have a clear understanding of the specific context and challenges involved. By following these steps, you can develop an action plan that systematically addresses potential failure points, mitigates risks, and improves overall organizational performance and resilience. However, I can provide you with a general framework that can be applied to various situations. Here are the key steps to consider:

Identify potential failure points: Conduct a thorough analysis of the situation to identify potential areas of risk and failure. This could include examining processes, systems, communication channels, resource allocation, and any other factors that could hinder success. Prioritize failure points: Evaluate the potential impact and likelihood of each failure point. Prioritize them based on their significance and the level of risk they pose to the project or objective. Root cause analysis: For each identified failure point, conduct a root cause analysis to understand the underlying reasons behind the potential failure. This will help identify the key factors contributing to the problem. Develop mitigation strategies: Based on the root cause analysis, develop specific strategies to mitigate or eliminate the identified failure points.

learn more about :- potential impact  here

https://brainly.com/question/264858

#SPJ11

Under fixed exchange rates, which one of the following statements is the MOST accurate? a. Devaluation causes a reduction of the money supply. b. Devaluation causes an expansion of the money supply. c. Devaluation causes a reduction in output. d. Devaluation causes a reduction in foreign reserves of the central bank.

Answers

The most accurate statement is that devaluation causes a reduction in foreign reserves of the central bank in a fixed exchange rate regime.

The most accurate statement under fixed exchange rates is that devaluation causes a reduction in foreign reserves of the central bank. A devaluation is a decrease in the exchange rate of a currency in a fixed exchange rate regime. It means that one unit of domestic currency can be exchanged for fewer units of foreign currency. This leads to a reduction in the foreign reserves of the central bank because the central bank must purchase its own currency with foreign currency to maintain the fixed exchange rate. Devaluation occurs when a country’s exchange rate falls, making its exports cheaper and its imports more expensive. When a devaluation occurs, the central bank can sell its foreign reserves and use the proceeds to buy back its currency in the foreign exchange market to support the exchange rate. However, if the devaluation is large or persistent, the central bank's foreign reserves may become depleted, which could lead to a loss of confidence in the currency and a run on the country's foreign reserves. In conclusion, the most accurate statement is that devaluation causes a reduction in foreign reserves of the central bank in a fixed exchange rate regime.

To know more about devaluation visit:

https://brainly.com/question/29519610

#SPJ11

Other Questions
What is the theory that states that cells come from other cells? O Evolutionary theory O Cell theory O Matter theory. O Growth theory Question 2 Multicellular organisms grow by making more cells instead of the individual cells growing. Falsetrue Let S = (1, 2, 3, 4, 5, 6, 7, 8) be a sample space with P(x) = kx where x is a member of S. and k is a positive constant. Compute E(S). Round your answer to the nearest hundredths. A temperate phage such as lambda phage O replicates viruses using the lysogenic life cycle replicates viruses in the lytic life cycle replicates viruses in both the lytic and lysogenic life cycles O only are infectious when shed from the infected bacterial cell all of the above are correct 1 pts Question 22 3 pts In Severe Combined Immunodeficiency disease, where there are no functioning lymphocytes, which of the following key step(s) in the inflammation process is/are NOT working in a person with this condition? 1.Tight junctions between endothelial cells are disrupted, allowing fluid to leak from the vessels into the tissue. 2. The phagocytes bind to the endothelial cells and exit the blood vessel by a process called diapedesis. 3. Once in the tissues, phagocytic cells engulf and destroy any microbial invaders. 4.The increase of fluids in the tissues causes the swelling and pain associated with inflammation. 5. The diameter of local blood vessels increases due to the action of inflammatory mediators. How does the Bohr effect change the oxyhemoglobin disassociation curve? (5 points) A turbine uses 100,000lbm/hr ( 50,000kg/hr) of steam that enters with an enthalpy of 1400 BTU/Ibm (3300 KJ/kg) and essentially zero entrance velocity. 10,000 horsepower (7.5 Kw) are developed. The exit velocity of the steam is 50 ft/sec (150 m/s). Expansion is adiabatic. What is the enthalpy? What are 3 types of linear dynamic analyses? In considering any structural dynamic analysis, what analysis is always important to run first and why? Explain Kingian nonviolence. Explain why civildisobedience (including Kingian nonviolence) is essential fordemocracy according to Howard Zinn and MLK. How well can tele-health, e-health, and/or m-health can address the issue below:Issues: Young people are less likely to seek help for mental health issues from others, particularly professional help.(500 words)(1500 words)Outline an intervention that uses one of these alternative delivery methods and has been found to be effective in addressing this problem. Provide a brief synthesis of the evidence of its effectiveness. Briefly explain why an economic evaluation of this intervention is needed/would be beneficial and describe the possible impact of this evaluation on decision-making and/or policy design. Finally outline the design of this economic evaluation by stating the comparison, perspective, outcome parameters and timeframe you would use. when deciding whether substantive procedures are to be performed at an interim date, the auditor should consider the Behaviors and beliefs that violate social expectations and attract negative sanctions are known as: a) Strain Ob) Disorganization Oc) Deviance d) Anomie Imagine the state of Utah passed a law that stipulated only aspecific number of special food cart permits would be awarded.Permits could be traded or sold, but no new permits would beissued. If I a Consider the isoparametric parent element below, which can be used for a general 12-node cubic quadrilateral element. The isoparametric domain below spans the usual square domain 1, 2 [1, 1]. The nodes are evenly spaced along each of the edges of the element.Write the shape function for node 1. Be sure to demonstrate your methodology/explain your reasoning to support your solution. One end of a u-tube is oriented directly into the flow so that the velocity of the stream is zero at this point. The pressure at a point in the flow that has been stopped in this way is called stagnation pressure. The other end of the u-tube measures the undisturbed pressure at that section in the flow. Neglecting friction, determine the volume of water in the pipe. Jason's lungs sounded wet on auscultation. Explain the physiology behind the fluid found in his lungs. How would this fluid affect PaO2 and PaCO2? "Continue considering Firm UVW. Suppose Firm UVW is considering investing in a new project of urban development. The cost of the project is $10 Millions of USD. Firm UVW expects that the non-incremental yearly cash flows from the project are \$3 Million of USD for the next five years; e.g. that is $3 Million of USD each year. Using the calculated WACC in the previous question, what is the Net Present Value (NPV) of the project? Note: Express your answers in strictly numerical terms. For example, if the answer is five million dollars, write 5000000 as an answer." "Firm UVW has a face debt value of $50 Million USDs trading at 85% with a pre-tax weighted cost of 8%. Firm UVW's common equity for the year was valued at $100 Million of USDS and preferred equity for $10 Million of USDs. The Preferred equity rate was calculated to be 20%. However, the common equity was to be calculated using CAPM approach, with a 2\% risk free rate and a 8.5% market risk premium rate, assuming a Beta of 1.5. If the tax rate is 35%, what is Firm UVW s WACC? Express your answers in strictly numerical terms. For example, if the answer is 5%, write 0.05 " To attend school, Arianna deposits $280at the end of every quarter for five and one-half years. What is the accumulated value of the deposits if interest is 2%compounded anually ? the accumulated value is ? A piston-cylinder device initially contains 0.6 kg of water at an absolute pressure of 10bar occupying a volume of 0.1 m 3 (State 1 ). The cylinder is connected to a large supply line that carries steam at an absolute pressure of 40 bar and a temperature of 500 C. The valve between the supply line and the cylinder is opened and the valve is left open until water in the cylinder is at an absolute pressure of 10 bar and a temperature of 240 C occupying a volume of 0.2 m 3 (State 2). Pressure remains constant while piston moves in the cylinder. Assume the boundary temperature is 300 C. Determine entropy generation during the process, in kJ/K. This is Human Anatomy and Physiology classMr. Andersen explains the concepts using car speed.These could be embellished if he added more descriptive "hows" soyou get the chance to do that!b. I Sea stars are in the phylum Echinoderms. From the list provided, select the characteristics that are observed in this phylum. Check All That Apply They prey on molluscs. Most have radial symmetry. They are pseudoceolomates. They have an incomplete nervous system. Determine the settings of Kp. TI and TD for a PID controller which gave a process reaction curve with a lag of 50 seconds and a maximum gradient [5 of 0.08/s when the test signal was a 5% change in the control valve position. Sketch the process reaction curve for the above setting.