Help me please
answers:
1
0
-1

Help Me Please Answers:10 -1

Answers

Answer 1

Answer:

Step-by-step explanation:

Using ( 0,0) and (1,1 ). the slope is 1 and the y intercept is 0 because the line cuts the y axis at the origin. The equation of the line is y=1x


Related Questions

10+\frac{3}{4}y=
10+
4
3

y=
\,\,43
43

Answers

Um, is there a possibility that you could clean this question up a bit? It is a little scrambled and hard to make out of the equation given. Thanks!

What is the solution to this equation?
3(4x + 3) = 2x-5(3-X) + 2

Answers

x = -4.4 or x = -4 2/5

Answer: The answer to this question is x= -22/5

Directions: Find the interior angle sum for each regular polygon. Round your answer to the nearest tenth if necessary.
This polygon's angles measure
???
degrees.

Answers

Answer:

below

Step-by-step explanation:

The SUM of a n-gon 's interior angles formula is :

  SUM = ( n-2) * 180       n = 7 for this figure ( 7 angles)

    (7-2) * 180  = 900 degrees    

  EACH angle in this REGULAR polygon is then 900 / 7 = 128.57°

What are the products 4/9 X 6 and 6 X 4/9

HELP NOW PLEASE

Answers

Answer: Both products are 2.6 repeating

you are interested in measuring the effects of a computer-assisted instruction program on the math scores of elementary school students; experimental and control students are matched on iq. group of answer choices within-subjects anova independent samples t test related samples t test between-subjects anova

Answers

you are interested in measuring the effects of a computer-assisted instruction program on the math scores of elementary school students within-subjects anova.

What is an ANOVA with within-subjects?

When there are identical participants in each group, a one-way repeated measures ANOVA, sometimes referred to as a within-subjects ANOVA, is used to assess whether three or more group means are different. The groups are sometimes referred to as "related" groups as a result.ANOVA within-subjects. Comparisons of the same individuals under various circumstances are included in within-subjects variables. For instance, each child's performance in the "ADHD Treatment" research was assessed four times, once after taking each of the four treatment doses for a week.A repeated measures ANOVA is another name for a within-subjects ANOVA. This kind of test is not just confined to two time periods; it is widely utilised when utilizing a pretest and posttest design.

To know more about anova check the below link:

https://brainly.com/question/25800044

#SPJ4

The replacement set for an equation is {10, 24, 25, 36}.

The equation is represented by the sentence, "56 of a number is 30."

What is the solution set of the equation?



Responses

{10}
open curly bracket 10 close curly bracket,

{24}
open curly bracket 24 close curly bracket

{25}
open curly bracket 25 close curly bracket

{36}

Answers

The solution set of the equation is {26}

What is Set?

Set is a collection of well defined objects.

Given,

The equation is represented by the sentence, "56 of a number is 30."

Replacement set for an equation is {10, 24, 25, 36}.

We need to find the solution set of the equation

"56 of a number is 30"

Fifty six of a number is thirty

56-30

26

Hence, the solution set of the equation is {26}

To learn more on Sets click:

https://brainly.com/question/8053622

#SPJ1

What is the equation of the line that passes through the point (−3,4) and has a slope of −2?

Answers

Answer:

y=−2x−2

Step-by-step explanation:

y=-2x-2 because i said so

find a set of scalar parametric equations for the line that passes through p(3, 4, 1) and q(4, -2, -1).

Answers

A set of scalar parametric equations for the line that passes through points p(3, 4, 1) and q(4, -2, -1) : x = 3 + 4t, y = 4 - 2t and z = 1 - t

In this question, we have been given two points p(3, 4, 1) and q(4, -2, -1).

We need to find a set of scalar parametric equations for the line that passes through points p and q.

We know that a set of scalar parametric equations is,

x = x0 + at, y = y0 + bt, z = z0 + ct

Let (x0, y0, z0) = (3, 4, 1)

and (a, b, c) = (4, -2, -1).

Therefore, scalar parametric equations as:

x = 3 + 4t,

y = 4 - 2t

and z = 1 - t

Learn more about the scalar parametric equations here:

https://brainly.com/question/28525706

#SPJ4

in math, a statement that shows that two expressions are equal.

Answers

Answer:

= this is that two expression two equal numbers

the ____ of a triangle is a segment that connects the midpoints of two side of the triangle called

Answers

Answer:

midsegment

Step-by-step explanation:

hope it helps!

The answer is mid-segment.

On a coordinate plane, a line goes through (negative 1, 1) and (0, negative 3). a point is at (negative 4, negative 3) and (0, negative 3). what is the equation, in point-slope form, of the line that is perpendicular to the given line and passes through the point (−4, −3)? y 3 = −4(x 4) y 3 = –one-fourth(x 4) y 3 = one-fourth(x 4) y 3 = 4(x 4)

Answers

The equation of the required line would be x - 4y = 8.

What is the slope-point form of the line?

Point-slope is the general form y-y₁=m(x-x₁) for linear equations. It emphasizes the slope of the line and a point on the line (that is not the y-intercept).

A line goes through the point (-1, 1) and (0,-3)

so the slope of the given line would be:

                     [tex]m=\frac{y_2-y_1}{x_2-x_1}\\\\m=\frac{-3-1}{0-(-1)}\\\\m=-4[/tex]

And we have to find the line which passes through the point (-4, -3) and the required line is perpendicular to the given line.

As we know the product of slopes of perpendicular lines is -1.

So the slope of the required line would be = 1/4

By using a slope-point form of the line, we get

    [tex]y - y_1=m(x-x_1)\\\\y-(-3)=\frac{1}{4}(x-(-4))\\\\4(y+3)=x+4\\\\4y+12=x+4\\\\x-4y=8[/tex]

Hence, the equation of the required line would be x - 4y = 8.

To learn more about the slope-point form of the line, visit:

https://brainly.com/question/24907633

#SPJ4

Answer:

C

Step-by-step explanation:

Drag and drop the answer into the box to match each point to its coordinates.

Answers

The required Co-ordinates are A(-0.5, -0.25), B(-2.5, 1.5) and C(0.25, 0.5).

How to calculate points on the graph?

To diagram a point, first find its situation on the x-axis, then track down its area on the y-hub, lastly plot where these meet. The middle place of the chart is known as the  origin  and is composed as the point (0, 0) since it's situated at the no point on the x-axis and the no point on the y-axis.

What are Co-ordinates ?

The distance of a point from y-hub scaled with the x-hub is called abscissa or x direction of the point. The distance of a point from x-pivot scaled with the y-hub is called ordinate. The abscissa and ordinate all together are called organizes.

According to question:

Now we find the co-ordinates of points on the graph,

Point A(-0.5, -0.25)

Point B(-2.5, 1.5)

And

Point C(0.25, 0.5)

Thus, required points are A(-0.5, -0.25), B(-2.5, 1.5) andC(0.25, 0.5).

To know more about Co-ordinates visit:

brainly.com/question/29329368

#SPJ1

PLEASE HELP, WILL GIVE BRAINLIEST! Help and explain, please! Thank you!

Answers

Answer:

56 cents

Step-by-step explanation:

cost/amount=price

4/2.24=0.56

5.6/10=0.56

6.72/12=0.56

Find x: 2x=1

X=1/2

X=1

X=2

X=-1

Answers

Answer: x = 1/2

Step-by-step explanation:

2(1/2)=1
1=1

Study the sequences (0, 6, 12, 18, 24, . . .) and (1, 6, 36, 216, 1,296, . . .), and answer these questions:

Which of the two sequences is an arithmetic sequence?
What is the common difference of the arithmetic sequence?
Can you think of any other mathematical relationship that exhibits a common difference between numbers?

Answers

Answer:

Step-by-step explanation:

In the first sequence, subtracting the previous term from each term starting from the second one gives these values: (0, 6, 12, 18, 24, . . .) is an arithmetic sequence.

How to find the common difference in the arithmetic sequence?

Common difference =  second term - first term

The difference between the terms is constant. This sequence is an arithmetic one, with the common difference being 6.

Common difference = 6.

Just by looking at the terms in the second sequence,

(1, 6, 36, 216, 1,296, . . .), the difference between the consecutive terms is not common. This sequence is not an arithmetic sequence because it is based on the multiply by 6 rule.

Like arithmetic sequences, linear equations show a common difference between numbers.

Answer: In the first sequence, subtracting the previous term from each term starting from the second one gives these values:

6 – 0 = 6, 12 – 6 = 6, 18 – 12 = 6, and 24 – 18 = 6.

The difference of the terms is constant. This sequence is an arithmetic one, with the common difference being 6.

Just by looking at the terms in the second sequence, (1, 6, 36, 216, 1,296, . . .), it’s clear that the difference of the consecutive terms is not common. This sequence is not an arithmetic sequence because it is based on the multiply by 6 rule.

Like arithmetic sequences, linear equations show a common difference between numbers.

Step-by-step explanation: Edmentum Answer

Independent random samples taken at two companies provided the following information regarding annual salaries of the employees. The population standard deviations are also given below. Company A Company B Sample Size 72 50 Sample Mean (in $1000) 48 43 Population Standard Deviation (in $1000) 12 10 a. We want to determine whether or not there is a significant difference between the average salaries of the employees at the two companies. Compute the test statistic. b. Compute the p-value; and at a=.05, test the hypotheses. c. Which company, if either, appears to have the higher salary? Provide a 95% confidence interval for the difference between the population mean salary of employees for the two companies.

Answers

a 95% confidence interval for the variation in the average employee salary for the two companies.

a. The test statistic is calculated by subtracting the sample mean of Company A from the sample mean of Company B, and then dividing the result by the square root of the variance, which is calculated by summing the population standard deviations of Company A and Company B, and then dividing by the sum of the sample sizes of Company A and Company B.

Test statistic = (48 - 43) / √(12^2 + 10^2) / (72 + 50) = 0.766

b. The p-value is calculated by using the test statistic to look up the value in a t-distribution table with degrees of freedom equal to the sum of the sample sizes minus two. The p-value is 0.239.

At a=.05, the null hypothesis that there is no difference between the average salaries of the employees at the two companies cannot be rejected.

c. Company A appears to have the higher salary. The 95% confidence interval for the difference between the population mean salary of employees for the two companies is (3.073, 5.927).

Learn more about confidence interval here

https://brainly.com/question/24131141

#SPJ4

Determine the smallest integer value of x in the solution of the following inequality.
5x7-1

Answers

The smallest integer value of x in the solution of the following inequality x is strictly less than 2 or x ∈ (-∞, 2)

What are inequalities?

Inequalities are statements that are represented as comparison between two or more numbers or algebraic expressions.(strictly less, strictly great, greater, lesser)

Given that the inequality 5x - 7 < 2x - 1

Solving the given equation:

5x - 7 < 2x - 1

5x - 7 - 2x < 2x - 1 - 2x

3x - 7 < -1

3x - 7 + 7 < -1 + 7

3x < 6

x < 2

Therefore, We conclude that x is strictly less than 2.

Hence x ∈ (-∞, 2)

Know more about "inequalities" here:

brainly.com/question/20383699

#SPJ1

Suppose we observe an unending sequence of days on which the umbrella appears. show that, as the days go by, the probability of rain on the current day increases monotonically toward a fixed point. calculate this fixed point.

Answers

The probability computed is <0.8967,0.1033> which roughly shows that, as 90 days pass by, the probability that it will rain on a given day will be increasing monotonically towards a fixed point.    

The chance that an event will occur ranges between 0 and 1. Where 0 shows that the event is impossible to occur and 1 shows that the event is bound to occur. If the chance of occurring an event is more than the chance of its not occurring then, it is more likely that the event will occur.

If we take the example of tossing a coin, we can say that the probability that a head will occur or a tail will occur will remain the same, i.e., 50%. The occurrence of heads or tails is equally likely.

These mathematical standards are used in varied fields of gambling, technology, finance, architecture, philosophy, science, etc.

To learn more about probability:

https://brainly.com/question/29583325

#SPJ4

If y varies inversely as x and x is 6 when y is 13, what is x when y is 8? a. 9.75 b. 3.69 c. 0.27 d. 6.5

Answers

If y fluctuates inversely as x as well as x is 6 if y is 13 then x is 9.75 when y is 8.

Define the term inverse proportion?When one variable declines, the others also decline in the same ratio. When two variables move in opposite directions, one variable reduces as another increases and the other increases as another variable lowers, the variables are said to be inversely proportional. Direct proportion is in opposition to it.

Inverse variation is demonstrated by the following equation when two quantities, x and y, are in inverse proportion:-

x y = x1 y1

Now, if x is 6 when y is 13 and y varies inversely with x, then at y =8,

Thus,

x × 8 = 6× 13

x = (6×13)/8

x = 9.75

As a result, if y varies inversely as x as well as x is 6 if y is 13 then x is 9.75 when y is 8.

To know more about the inverse proportion, here

https://brainly.com/question/1266676

#SPJ4

the strong law of large numbers states that, with probability 1, the successive arithmetic averages of a sequence of iid random variables converge to their common mean . what do the successive geometric averages converge to? t

Answers

The successive geometric averages of a sequence of iid random variables converge to the common geometric mean.

the strong law of large numbers states that, with probability 1, the successive arithmetic averages of a sequence of iid random variables converge to their common mean . The successive geometric averages of a sequence of iid random variables converge to the common geometric mean. The Geometric Mean (GM) in mathematics is the average value or mean that, by calculating the product of the values of a collection of numbers, denotes the central tendency of that set of numbers. In essence, we multiply the numbers collectively and take the nth root of the multiplied numbers, where n is the total number of data values.

Learn more about mean here

https://brainly.com/question/15323584

#SPJ4

A construction company is considering submitting bids for two contracts. The company estimates that it has a 20\%20%20, percent chance of winning any given bid. Here is the probability distribution of x=x=x, equals the number of bids the company wins:.

Answers

Where the variance is 0.32, the mean is 0.40, and there are provided sets of probabilities, the standard deviation will be 0.566.

What is standard deviation?

The average degree of variability in your dataset is represented by the standard deviation. It reveals the average deviation of each statistic from the mean. In general, values with a high standard deviation are spread out from the mean, whereas those with a low standard deviation are grouped together close to the mean.

Here,

mean=0.4

variance=(Xn-mean)².P(x)n

=(0-0.4)²*(0.64)+(1-0.4)²*(0.32)+(2-0.4)²*0.04

variance=0.32

Standard deviation=√(variance)

=√0.32

=0.566

The standard deviation will be 0.566 where variance in 0.32 and mean is 0.40 and given sets of probability.

To know more about standard deviation,

https://brainly.com/question/13905583

#SPJ4

You plan to construct a brick wall measuring 14. 5 ft. In length, 5. 5 ft. High, and 0. 5 ft. In width. If a brick measures 6 in. X 4 in. X 2 in. , how many bricks will you need? (remember to round up. ) total volume (to the nearest tenth) = cubic feet. The number of bricks =.

Answers

Using simple mathematical operations, we know that we will require 1436 bricks to construct a brick wall.

What are mathematical operations?

A mathematical "operation" is the process of calculating a value utilizing operands and a math operator.

There are predefined rules associated with the math operator's symbol that must be applied to the supplied operands or numbers.

In mathematics, addition, subtraction, multiplication, division, and modular forms are the five basic operations.

So, we know that:


A brick wall's measurements are provided by:

14.5 feet in length

Size: 0.5 feet wide

5.5 feet tall

Brick dimensions are provided by:

6 inches in length

4-inch width

2 inches tall

The number of bricks must be determined:

Thus, the number of bricks is provided by:

Number of bricks = Volume of brick wall/Volume of brick

Number of bricks = 14.5 * 5.5 * 0.5 * 12 * 12 * 12/6 * 4 * 2

Number of bricks = 1435.5

Number of bricks = 1436

Therefore, using simple mathematical operations, we know that we will require 1436 bricks to construct a brick wall.

Know more about mathematical operations here:

https://brainly.com/question/28937023

#SPJ4

a quiz consists of 24 questions. each question has 4 answer choices with exactly one correct answer. a student is completely unprepared for the quiz, so he guesses on all 24 questions. how many questions should the student expect to answer correctly?'

Answers

According to the binomial distribution, there are 13 questions should the student expect to answer correctly.

Binomial distribution:

in statistics, binomial distribution refers the probability of getting a success must remain the same for the trials we are investigating.

Given,

A quiz consists of 24 questions. each question has 4 answer choices with exactly one correct answer. a student is completely unprepared for the quiz, so he guesses on all 24 questions.

Here we need to find how many questions should the student expect to answer correctly.

While we looking into the given question, we have identified that the total number of questions is 24.

Number of options = 4

So, the probability of getting correct answer = 1/4 = 0.25

The probability of getting incorrect answer is,

=> 1 - 1/4 = 3/4 = 0.75

So, based on the binomial distribution,

X ~ Binomial Distribution (m=25, p=0.25, q=0.75)

Then in probability it can be written as,

=> P (X=13) = (25C13)x ((0.25)¹³) x ((0.75)¹²)

=> P (X=13) = 0.00245461663

Therefore, the number of correct answers is 13.

To know more about Binomial distribution here.

https://brainly.com/question/14565246

#SPJ4

Suppose y varies directly as x. Write a direct variation equation that relates x and y. Then solve.
​If y = -4 when x = 2, find y when x = 3 .

ur answer should have ,-6

Answers

When X = 3 then Y = -6

Here is the explanation:

If Y1 = -4 when X1 = 2

and if X2 = 3 when Y2 = ?

The formula is

[tex]\frac{Y2}{X2} =\frac{Y1}{X1}\\\\Y2 = \frac{Y1}{X1} x X2\\\\Y2=\frac{-4}{2}x3\\\\Y2=-6[/tex]

Hence if X = 3 then Y = -6

Read more about direct variation here

https://brainly.com/question/13977805

#SPJ1

Does anyone know the answer or how to solve this please?

Answers

Answer:  Choice (E)   [tex]\displaystyle \text{xz} = \boldsymbol{\frac{\text{x}^3}{\text{zy}^2}}[/tex]

=========================================================

Explanation:

The goal is to find what xz is equal to (in terms of x, y, and z)

We are given [tex]\text{z}= \frac{\text{x}^2}{\text{zy}^2}[/tex]

The only thing we're missing on the left hand side is x.

Let's multiply both sides by x.

[tex]\text{z} = \frac{\text{x}^2}{\text{zy}^2}\\\\\text{xz} = \text{x}*\frac{\text{x}^2}{\text{zy}^2}\\\\\text{xz} = \frac{\text{x}*\text{x}^2}{\text{zy}^2}\\\\\displaystyle \text{xz} = \boldsymbol{\frac{\text{x}^3}{\text{zy}^2}}[/tex]

This points us to choice (E) as the final answer.

what is the ratio of the area of a square inscribed in a semicircle with radius $r$ to the area of a square inscribed in a circle with radius $r$? express your answer as a common fraction.

Answers

Ratio of the area of a square inscribed in a semicircle with radius 'r' to the area of a square inscribed in a circle with radius 'r' is equal to 2: 5.

As given in the question,

Let ABCD be the square with side 'a' inscribed in a semicircle with radius 'r'.

'O' be the center of the semicircle.

'M' be the midpoint of AB such that MB = a/2

Join OM, OB and OM ⊥ AB

OB = r

OM = BC = a

In ΔOMB.

OB² = OM² + MB²

⇒ r² = a² + (a/2)²

⇒r² = 5a²/4

⇒a² = 4r²/5

Area of the square inscribed in a semicircle = a²

                                                                         = 4r²/5

Let PQRS be the inscribed in a circle with side 'x'

Diagonal of the square inscribed in a circle = 2r

In ΔPQR,

PR = diagonal

     = 2r

PQ = QR = x

PR² = PQ² + QR²

⇒(2r)² = x² + x²

⇒x² = 4r² /2

⇒x² = 2r²

Area of the square inscribed in a circle = x²

                                                                 = 2r²

Ratio of the area of the square inscribed in ( semicircle to the : circle )

= 4r²/5 / 2r²

= 2 / 5

= 2 : 5

Therefore, ratio of the area of the squares inscribed in a semicircle to the circle is 2 : 5.

Learn more about  squares inscribed in a semicircle here

brainly.com/question/3206065

#SPJ4

on january 1 electro incorporated issued $740,000 of 7.5%, four-year bonds that pay interest semiannually on june 30 and december 31. they are issued at $680,186 and their market rate is 10% at the issue date. after recording the entry for the issuance of the bonds, bonds payable had a balance of $740,000 and discount on bonds payable had a balance of $59,814. electro uses the effective interest bond amortization method. the first semiannual interest payment was made on june 30. complete the necessary journal entry for the interest payment date of june 30 by selecting the account names from the drop-down menus and entering the dollar amounts in the debit or credit columns.

Answers

The interest payments is  $27,750 and the Bond payable discount is $6,259

The electro incorporated issued $740,000 of 7.5%, four-year bonds that pay interest semiannually on june 30 and december 31.

They are issued at $680,186 and their market rate is 10% at the issue date

Interest payments = $740,000 x 7.5% x 1/2 = $27,750 (the credit to Cash).

bond interest expense = carrying value at 1/1/13 (the beginning of the period) of $680,186 x market rate of 10% x 1/2 = $34,009 (the debit to Bond interest expense).

Bond payable discount

The discount amortization  $34,009 - $27,750 = $6,259

Therefore, the interest payments is  $27,750 and the Bond payable discount is $6,259

To learn more about discount refer here

https://brainly.com/question/7459025

#SPJ4

At 1,000 units of output, the fixed cost of production is $12,500 per week. Total cost of producing 1,000 units per week is $28,500 per week. The variable cost of producing 1,000 units of output per week is equal to _____.

Answers

The variable cost of producing 1000 units per week is equal to $16000.

Variable costs are those that change with volume. Raw materials, piece-rate labour, production supplies, commissions, shipping costs, packing costs, and credit card fees are examples of variable costs. The variable costs of production are referred to as "Cost of Goods Sold" in some accounting accounts.

Given,

Fixed cost of production per week =$12500

Total cost of producing 1000 units per week =$28500

then,

variable cost of producing 1000 units per week = 28500-12500=$16000

Thus, the variable cost of producing 1000 units per week is equal to $16000.

To learn more about variable cost refer here

https://brainly.com/question/28652728?referrer=searchResults

#SPJ4

Identify the slope of the function. Interpret its meaning in terms of the problem situation.

Answers

slope is 300/600
simplified is 1/3
for every 1 adult tickets sold 3 student tickets are sold

The length of a hadow of a building i 15 m. The ditance from the top of the building to the tip of the hadow i 25 m. Find the height of the building. If neceary, round your anwer to the nearet tenth

Answers

Answer:

The height of the building is 20 meters

Step-by-step explanation:

What is Pythagoras theorem ?

The Pythagoras Theorem states that the square of the hypotenuse side in a right-angled triangle is equal to the sum of the squares of the other two sides. The Perpendicular, Base, and Hypotenuse are the names of the three sides of this triangle.

[tex]c^{2}=a^{2}+b^{2}[/tex]

Where c is the hypotenuse , a is perpendicular length , b is base

Length of the shadow of a building b = 15 m.

The distance from the top of the building to the tip of shadow c = 25 m

Let us assume the Height of the building to be = a

According to the pythagoras theorem

[tex]c^{2}=a^{2}+b^{2}[/tex]

[tex]25^{2}=a^{2}+15^{2}[/tex]

[tex]a^{2} = 25^{2}-15^{2}[/tex]

[tex]a^{2}[/tex] = 625-225

[tex]a^{2}[/tex] = 400

a = 20 meters

The height of the building is 20 meters

To know more about pythagoras theorem

https://brainly.ph/question/14449009

#SPJ4

Other Questions
The 2nd Industrial Revolution was benefit America or not? How can answer this question in a paragraph please the kern river oil field has gone through periods of boom and bust, starting with the tar mined by the yokut people to the more recent extraction of millions of barrels of crude oil annually. each period of decline in oil production was revived by . Repeated, wavelike smooth muscle contractions in the gi tract that move food through the tract are called. what is the degrees of freedom for the t distribution? (round your answer down to the nearest integer.) (c) what is the p-value? (round your answer to four decimal places.) p-value List and describe the types of cellular transport 9. A rectangle has a perimeter of 62 inches. The length of the rectangle is 18 inches. What is the approximate width of the rectangle in centimeters? (1 inch is approximately 2.54 centimeters)A. 33 cmB. 610 cmC. 65 cmD. 152 cm consider the ester (group a) molecules. describe the effect on carbonyl bond strength of adding one, and then two. oxygens. explain the relationship between diffraction angle and wavelength using the two dimensional diffraction relationship n a manufacturing plant has a potential production capacity of 1,000 units per month (capacity can be increased by 10% if subcontractors are employed). the plant is normally operated at about 80% of capacity. operating the plant above this level significantly increases variable costs per unit because of the need to pay the skilled workers higher overtime wage rates. for output levels up to 80% of capacity, variable cost per unit is $100. above 80% and up to 90%, variable costs on this additional output increase by 10%. when output is above 90% and up to 100% of capacity, the additional units cost an additional 25% over the unit variable costs for outputs up to 80% of capacity. for production above 100% and up to 110% of capacity, extensive subcontracting work is used and the unit variable costs of these additional units are 50% above those at output levels up to 80% of capacity. at 80% of capacity, the plant's fixed costs per unit are $50. total fixed costs are not expected to change within the production range under consideration. g an apple pie in a 9.00 in diameter plate is placed upon a rotating tray. then, the tray is rotated such that the rim of the pie plate moves through a distance of 158 in. express the angular distance that the pie plate has moved through in revolutions, radians, and degrees. why does dally let johnny tell him to stop harassing the gitls when normally he would have never listened to anyone telling him what do do You have discovered that hackers are gaining access to your WEP wireless network. After researching, you discoverthat the hackers are using war driving. You need to protect against this type of attack. What should you do? A triangle ABC. If a = 100 inches, b = 60 inches, and C= 60, Find c.Use the low of cosines Graph the linear function: f(x)=-2(x+4)This is high school level mathAlgebra:1PLEASE HELP ME. I DONT UNDERSTAND WHAT IM SUPPOSED TO DO!Please provide an explanation on how you got your answer. Thank you! if an open rectangular box is to have a fixed volume v, what relative dimensions will make the surface area a maximum When are clinicians allowed to consult with other clinicians about a clients diagnosis?. the total bilirubin level of a 36-hour, breastfeeding newborn is 14 mg/dl. based on this finding, which intervention should the nurse implement? Which one is a spontaneous reaction?Pd(s) + Be2+(aq) Be(s) + Pd2+(aq)3Sn(s) + 2Ga3+(aq) 2Ga(s) + 3Sn2+(aq)Be(s) + Sn2+(aq) Sn(s) + Be2+(aq)3Pd(s) +2Ga3+(aq) 2Ga(s) + 3Pd2+(aq) alpha polonium crystallizes in a simple cubic unit cell with an edge length of 336 pm. what is the density of alpha polonium (in g/cm^3)? Write a paragraph about the 1887 Jim Crow law