Due to construction delays on the trip from Little Rock to Chicago, a van driver averaged 48 miles each hour. About how long did that trip take?

Answers

Answer 1
from chicago to little rock is 9 hours and 30 mins so the answer should be 432 miles without the 30 mins but with it; it’s 456 miles

Related Questions

What kind of fraction will you have when the percent is over 100%

Answers

Answer:

100% means “100 out of 100” — in other words, everything. So when you say you have 100% confidence in someone, you mean that you have complete confidence in them. But a lot of times, percentages larger than 100% are perfectly reasonable.!

Answer:

"Improper Fraction"

Step-by-step explanation:

An improper fraction is a fraction where the numerator exceeds the denominator. When the percent is over 100%, then technically the numerator is exceeding the denominator when the percentage is converted to a fraction.

Example:

110%convert to fraction... [tex]\frac{110}{100}[/tex]simplify... [tex]\frac{11}{10}[/tex]

You can go further by making it a proper fraction but that is beyond the current problem we are solving.

help with this question please

Answers

C because -7 is the biggest and x is smaller
The answer is C............


Parallelogram ABCD has
coordinates A(1,5), B(6,3),
C(3,1), and D(2,1). What are the
coordinates of E, the intersection
of diagonals AC and BD?

Answers

Answer:

Step-by-step explanation:

just help me again for 2 times

Answers

Answer:

A. 86.7

first, the base. length x width.

it's square, so

5.1 x 5.1= 26.01

then the sides. formula for a triangle is base times height divided by 2.

5.1 x 5.95= 30.345 divided by 2 is 15.1725

there are 4 sides, so multiply times 4

4 x 15.1725= 60.69

now, add the base to the sides

26.01 + 60.69= 86.7

HELP HAVING A BAD DAY


Roger can finish his math homework in 6 hours. Trish can finish the same homework in 5 hours. What part of the homework will Roger and Trish finish if they work together for x hours?

I WILL REWARD BRAINLIEST FOR THE CORRECT ANSWER

Answers

Answer:

Rodger and Trish will finish the homework together for 30 hours. x=30

Step-by-step explanation:

This is a very simple problem. Its an lcm problem (lcm means lowest common multiple)

To find the lcm you must find the common number the two numbers 5 and 6 share which is 30. Hope that helps, sorry your having a bad day. (i am too bad days suck)

6    5

12   10

18   15

24   20

30   25

       30

And the file the other person shows never work, they are bots (robots) who waste your time answering your questions and waste your brainly points. ugh it gets to annoying.

Roger and Trish can finish 11x/30 of the homework if they work together for x hours.

What is Expression?

An expression is combination of variables, numbers and operators.

Let the total amount of work in the math homework is 1.

In one hour, Roger can finish 1/6 of the work, and Trish can finish 1/5 of the work. So, working together for one hour, they can finish:

(1/6) + (1/5)

= (5/30) + (6/30)

= 11/30 of the work.

If they work together for x hours, then they will finish:

x × (11/30) = 11x/30

of the work in x hours.

Therefore, Roger and Trish can finish 11x/30 of the homework if they work together for x hours.

To learn more on Expressions click:

https://brainly.com/question/14083225

#SPJ3

Write a function that represents the total cost of your family's outing to the soccer game after x hours.

Answers

Answer:

Please attach an image.

f(x) = (cost)x

Answer:

c=s*x

Step-by-step explanation:

C will be the total cost of our family's outing to the soccer game

While x will be the hours

and S will be the soccer game

So s*x will equal the cost

Making c=.

Hope this helps!

:D

A floor tile is shaped like a regular hexagon. The side lengths are 4 cm and the apothem 23‾√ cm.

What is the area of the hexagonal floor tile?

Enter your answer as a decimal to the nearest hundredth.
area = cm2

Answers

Answer:

41.57 cm²

Step-by-step explanation:

to understand thisyou need to know about:geometryPEMDAStips and formulas:area of a regular hexagon when apothem is given:½×P×Alet's solve:

parimeter of a regular hexagon:6a

therefore

=½×[4×6]×2√3 cm²

simplify parentheses:

=½×24×2√3 cm²

simplify fraction:

=24×√3 cm²

=41.57cm²

Answer:

41.57

Step-by-step explanation:

took the test

y=3/4x+2 linear or non linear

Answers

Answer:

linear

Step-by-step explanation:

URGENT HELP PLZ ILL GIVE BRAINLIEST!!!

Answers

Answer:

36

Step-by-step explanation:

The sum of the angles of a triangle is 180 degrees

<A+ <B+ <C = 180

2x+6x+2x = 180

10x = 180

Divide by 10

10x/10 = 180/10

x = 18

We want to find <C

<C = 2x

     = 2*18

    = 36

Determine the exact value for sec (5π/4)

Answers

Answer:

-√2

Step-by-step explanation:

C on Edg

Answer: - square root 2

Step-by-step explanation: c on edge


Is the line y = 0.6x - 1

Answers

Answer:yes!

Step-by-step explanation:

Answer:

Yes

Step-by-step explanation:

To prove check out this screenshot Mark my answer the brainliest to tell you the 4 math calculators :)

Determine a pair of angles (one positive and one negative) in degree measure coterminal to the angle 117°.​

Answers

Answer:

Option B.

Step-by-step explanation:

When we have an angle A, in degrees, the coterminal angles are all the angles that can be written as:

B = A + n*360°

Where n is a positive or a negative integer (if n = 0, then B = A, which means that A is coterminal with itself, which is trivial).

Now we want to find two coterminal angles to 117°, such that one is positive and the other negative.

Then we can do:

for the positive one, use n = 1.

B = 117° + 1*360° = 477°

For the negative one, use n = -1

B = 117° - 1*360° = -243°

Then the two angles are 477° and -243°

The correct option is B.

which is the equation of a hyperbola centered at the origin with focus ( 0,4) and vertex (0,sqaure root 12)

Answers

Answer:

the equation of the hyperbola is y^2/12-x^2/4=1

Step-by-step explanation:

Answer:

A

Step-by-step explanation:

The ans above is A

sorry for all the screen wrinkles but what’s this

Answers

Answer:

cubic polynomial, monomial

Step-by-step explanation:

A. ASA Postulate
B. HL Theorem
C.AAS Theorem
D. SAS Postulate

Answers

Answer:

your answer will be B. HL Theorem

Step-by-step explanation:

hope it helps you...

Is 16t - 3t equivalent 3t - 16t

Answers

Answer:

No, 16t -3t equals 13t while 3t - 16t equals -13t

Answer:

No,

16t= 16x2=32

3t=3x2=6

32-6=26

3t=3x2=6

16x2=32

6-32=-26

Step-by-step explanation:

t=2?

A doll's house is
1/8
the size of a real house.
The length of the doll's house is 1.5m.
How long is the real house?

Answers

Answer:

12m,

Step-by-step explanation:

1.5 times 8 =12

One pound of pasta noodles can be made using the ingredients shown in the recipe below. A chef uses 166 1/4 cups of flour each week to make noodles. How many pounds of noodles does the chef make each week?

Answers

Answer:

Pounds of noodles made per week = 47 1/2 pounds

Step-by-step explanation:

One pound of pasta noodles can be made using the ingredients shown in the recipe below.

Recipe for Pasta Noodles

Ingredients

3 1/2 cups of flour

4 large eggs

2 teaspoons of olive oil

A chef uses 166 1/4 cups of flour each week to make noodles. How many pounds of noodles does the chef make each week?

28 1/2

47 1/2

53 1/4

55 1/2

Pounds of noodles made per week = Total cups of flour used each week / flour used per pound

= 166 1/4 ÷ 3 1/2

= 665/4 ÷ 7/2

= 665/4 ÷ 2/7

= (665*2)/(4*7)

= 1330/28

= 47.5 pounds

Pounds of noodles made per week = 47 1/2 pounds

Joe buys 6 adult tickets and 4 child tickets for the movies. Each adult ticket cost $9. Each child ticket cost the same amount. Joe pays with a $100 bill and gets $22 in change. How much does each child ticket cost?

Answers

Answer:

Each child ticket cost = $6

Step-by-step explanation:

Joe has = $100

His balance after tickets purchase = $22

Actual amount spent on tickets = $100 - $22 = $78

But,

Each adult ticket cost = $9

Total no of adult = 6

Total amount spent (adults) = $9 x 6 = $54

Balance remaining = $78 - $54 = $24

Amount spent of 4 child tickets = $24

No of children = 4

Therefore,

Amount spent on 1 child (1 ticket),

= $24/4 = $6.

It could be seen that each child ticket cost six dollars.

Please help! Will give brainliest

Answers

Answer:

The answer is D

Step-by-step explanation:

Down 3 over 1

Answer is D
Have a great day!!


help me please ! in going to fail

Answers

Answer:

can't see the question properly

Answer:

I think the answer is A bc x is slope and y is y intercept

A parallelogram has sides 17.3 m and 43.4 m long. The height corresponding to the 17.3-m base is 8.7 m. Find the height, to the nearest tenth of a meter, corresponding to the 43.4-m base.

Answers

Answer:

3.5m

Step-by-step explanation:

A parallelogram has sides 17.3 m and 43.4 m long.

The height corresponding to the 17.3-m base is 8.7 m.

The area of a parallelogram = base × height

= 8.7m × 17.3m

= 150.51m²

Both parallelograms have the same area

Hence, the height, to the nearest tenth of a meter, corresponding to the 43.4-m base is calculated as:

= 150.51m²/43.4m

= 3.4679723502m

Approximately = 3.5m

The value of the function f(x) is 600 when x=0 and decreases by 9% for every one-unit increase in x. Complete the equation that represents the function f(x)
its a open answer please help

Answers

Answer:

[tex]f(x)=600(0.09)^x[/tex]

Step-by-step explanation:

Since f(x) decreases by 9% for every one unit increase in x, it means that f(x) is an exponential decay function. An exponential function is given by:

f(x) = [tex]ab^x[/tex]; where a is the value of f(x) at x = 0, b is the multiplier and is less than 0 for a decay.

Therefore since at x = 0, f(x) = 0. Hence a = 600. Also, b = 9% = 0.09.

The function f(x) can hence be represented as:

[tex]f(x)=600(0.09)^x[/tex]

Given f(x) =1 - 3/4x find the following.
a. f(-12) b. f(0) c. f(4)

Answers

Answer:

a. f(-12) = 10

b. f(0) = 1

c. f(4) = -2

Step-by-step explanation:

In order to find the function of each of these numbers, you just need to replace them in the function as x and then solve:

a. f(-12) = 1 - 3/4(-12)

 - f(-12) = 1 - (-36/4)

 - f(-12) = 1 + 9

 - f(-12) = 10

b. f(0) = 1 - 3/4(0)

 - f(0) = 1 - 0

 - f(0) = 1

c. f(4) = 1 - 3/4(4)

 - f(4) = 1 - 12/4

 - f(4) = 1 - 3

 - f4) = -2

Carlos landlord added a markup of 6.5% to their October rent . Carlos rent would have been 750 what is the cost of his rent after the markup​

Answers

Answer:

c

Step-by-step explanation:

dont know if i am right

PLEASE HELP +10 pts BUT BETTER SHOW WORK ON HOW U GOT THE ANSWER! No links. Plz.



I’ll report if u don’t answer the question I literally need help with this is no joke.

Answers

Don’t press on it it’s a s c a m
Be carful

Choose Yes or No to tell whether the symbol will be reversed when the variable is isolated in each inequality.
–10.5 < 3a
b/6 ≤ 7
–4.5c > 9
–21/5 ≤ –5/2d
Please I need this answer right away!!!

Answers

Answer:

No, no, yes, yes

Step-by-step explanation:

–10.5 < 3a ⇒ -3.5 < a ⇒ a > -3.5

no as variable has positive coefficient

b/6 ≤ 7 ⇒ b ≤ 42

no as variable has positive coefficient

–4.5c > 9 ⇒ c < - 2

yes as variable has negative coefficient

–21/5 ≤ –5/2d ⇒ (-21/5)*(-2/5) ≥ d ⇒ d ≤ 42/25

yes as variable has negative coefficient

plz help i need some one to check if this is right :(

Answers

Answer:

no the one above it

Step-by-step explanation:

because i have had it recently

Multiplying and dividing radical expressions and leaving them in factored form. I am trying to find the best and easy way to get the factored form correctly. This is my problem: 3x+8 over 36-2x / 27x^2+72x over 3x^2-27.

Answers

Answer:

[tex]\frac{3x + 8}{36 - 2x} / \frac{27x^2 + 72x}{3x^2 - 27} = \frac{(x - 3)(x+3)}{6x(18 - x)}[/tex]

Step-by-step explanation:

Given

[tex]\frac{3x + 8}{36 - 2x} / \frac{27x^2 + 72x}{3x^2 - 27}[/tex]

Required

Solve

Change / to *

[tex]\frac{3x + 8}{36 - 2x} * \frac{3x^2 - 27}{27x^2 + 72x}[/tex]

Factor out 3

[tex]\frac{3x + 8}{36 - 2x} * \frac{3(x^2 - 9)}{3(9x^2 + 24x)}[/tex]

[tex]\frac{3x + 8}{36 - 2x} * \frac{(x^2 - 9)}{(9x^2 + 24x)}[/tex]

Factorize:

[tex]\frac{3x + 8}{36 - 2x} * \frac{(x^2 - 9)}{3x(3x + 8)}[/tex]

Cancel out 3x + 8

[tex]\frac{1}{36 - 2x} * \frac{(x^2 - 9)}{3x}[/tex]

Factorize:

[tex]\frac{1}{2(18 - x)} * \frac{(x^2 - 9)}{3x}[/tex]

Combine

[tex]\frac{x^2 - 9}{2*3x(18 - x)}[/tex]

[tex]\frac{x^2 - 9}{6x(18 - x)}[/tex]

Express the numerator as a difference of two squares

[tex]\frac{(x - 3)(x+3)}{6x(18 - x)}[/tex]

Hence:

[tex]\frac{3x + 8}{36 - 2x} / \frac{27x^2 + 72x}{3x^2 - 27} = \frac{(x - 3)(x+3)}{6x(18 - x)}[/tex]

If a=3 and b=7 find the value of
2ab​

Answers

Answer:

2ab-87=12 to the 100th times 2ab equals 79 the answer

Step-by-step explanation:

Other Questions
Read the sentence.Sayeed Johnson, whois running for mayor, will be speaking at the city library tonight.Which terms describe the underlined portionof the sentence? Select twooptions.O appositiveclausenonrestrictiveO phraseO restrictive ill mark brainlist plss help keiko has bought 36pounds of dog food, she feed the dog 3/4 pound of food each meal. how many meals would this last The Adams family bought a small piece of land in the hill country. The plot is in the shape of a rectangle and measures about 50 yards by 41 yards. What is the area of the plot? Imagine you are planning an educational trip to travel anywhere you choose. Where would you go and why? What would you hope to experience while visiting there? Remember that this is not a vacation - the purpose of the trip is to gain a unique educational experience. What is the effect of endikus dream interpretation I enjoy reading, just as my parents enjoy reading. While I may have inherited some traits (or genotype) that made it more likely that I would grow up to love reading, my love of reading is actually a BLANK-1 because it is an observable trait. Please help meee Women's Rights1. "Everything we see in the world is the creative work of women."What changed in Turkey as a direct result of Atatrk's efforts?(1) Turkey adopted a more modern Western orientation.(2) Turkey's government was dominated by Islamic clerics.(3) Secularism in Turkey was universally accepted.(4) Communist forces seized power in Turkey At the end of the first day three of the cricketers scored these runs 28, 61 and 39The man adds them together and the total score is 128But his friend checks his calculation by using approximation Show how the friend used approximation to check the calculation How does the REE change as a person ages?Explain Brainliest for correct answer Given the two equations:y + x = 5-2x = -10) Draw the graphs of both equations on the same pair of axes by using a scale of 1cm torepresent 1 unit on both axes.Use your graph to determine the point of intersection. Contribution Margin and Contribution Margin RatioFor a recent year, McDonald's company-owned restaurants had the following sales and expenses (in millions):Sales $18,169.3Food and packaging $ 6,129.7Payroll 4,756.0Occupancy (rent, depreciation, etc.) 4,402.6General, selling, and administrative expenses 2,487.9 $17,776.2Income from operations $ 393.1Assume that the variable costs consist of food and packaging, payroll, and 40% of the general, selling, and administrative expenses.a. What is McDonald's contribution margin? Round to the nearest tenth of a million (one decimal place).b. What is McDonald's contribution margin ratio? Round to one decimal place.c. How much would income from operations increase if same-store sales increased by $500 million for the coming year, with no change in the contribution margin ratio or fixed costs? Round your answer to the nearest tenth of a million (one decimal place). What is the length of the hypotenuse of the triangle? PLS HELP. If the spinner shown below was used 100 times, how many times can you expect to spin a number greater than 3? 360240 20x - 16y + 32 plz help Astronomers typically measure distances to stars in units called kilometersTrueO False Can any of you guys help my cousin with her homework its very confusing to me I'm not very good at math so please help her she gotta have everything turned in by Friday!! 2. China is the third largest country in population. *TrueO False