Answer:
C
Step-by-step explanation:
answer:
C. no, because 6^2 + 8^2 [tex]\neq[/tex] 12^2
step-by-step explanation:
use the pythagorean theorem formula in order to solve thisthe formula: a^2 + b^2 = c^2now plug in the valuesa^2 + b^2 = c^2
6 = a8 = b12 = c6^2 + 8^2 = 12^2
36 + 64 = 144
100 [tex]\neq[/tex] 144
the symbol is "not equal"as you can see they are NOT equalHow can I add ¾? Explain.
Answer:
Step-by-step explanation:
you can do many things to add 3/4, most common way si thinking of 3/4 3 quarters of your number
you can add 3/4 to 1 which is 1 3/4
1+3/4=1 3/4
or,
you could do
3/4 OF 10 is 3 quarters of 10 which is 2.5x3 or 10 -2.5 which equals,
7.5
Answer:
You can add 3/4 by adding as a decimal so 3/4 of 100 is 75 so it would be .75
Step-by-step explanation:
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging
help/
Answer:
Part A answer: 10 2/3 months
Part B answer: No
Step-by-step explanation:
Using what we gathered from the word problem, and the hint, we know that y = distance, x = time, and b = 3200.
3200 is the total number of ft meant for the hole to be dug. If we've been digging for 5 months, and we have 1700 ft yet to be dug, then after 5 months we have dug (3200 - 1700 =) 1500 ft in 5 months.
-1500 ft/5 months = 300 ft/month
-Digging the final 1700 ft will take 5 2/3 months
^ Using this information, we know that the total number of months it takes to dig the entirety of the tunnel is 10 2/3
In the second part of the problem, we're asked to determine whether or not a deadline of August 2021 was enough time to complete the 10 2/3 month-long project if the digging began in December of 2020.
If said project commenced in December 2020, and the deadline was August 2021, then there would be 1, 2, 3, 4, 5, 6, 7, 8... Roughly 8 1/2 months to complete the tunnel. 10 2/3 months is > (greater than) 8 1/2 months. So, no. That start-to-finish deadline would not be enough time.
Good luck!!
50 males liked the veggie burger and 40 males liked the pizza so out of 90 males what percent liked the burgers?
Answer: 10%?????????????????????
Step-by-step explanation:
Erik transformed the equation y = 2(x − 2)^2 + 5 from vertex form to standard form. His steps are shown below. Is Erik's work correct? If not, identify and correct his error.
y = 2(x − 2)^2 + 5
y = 2(x^2 − 4x + 4) + 5
y = 2x^2 − 8x + 8 + 5
y = 2x^2 − 8x + 13
A. No. The error is in the second line: the expanded form of (x − 2)^2 is x^2 − 4.
B. No. The error is in the third line: the product of 2 and x^2 − 4x + 4 is 2x^2 − 4x + 4.
C. No. The error is in the fourth line: the sum of 8 and 5 is 12.
D. Yes. Erik is correct in his transformation from vertex form to standard form.
Brainiest if correct
Find the value of b given the points (-6, 8) and (-1, b) if the distance is [tex]\sqrt{29}[/tex]
Answer:
the distance is 10
will give branliest
how do i Translate a algebraic expression into verbal expression?
Answer:
I guess try to understand it first
Step-by-step explanation:
How to pronounce y = x^2 / 2^3 + 0.423x
Y is equal to x squared divided by two to the third power plus zero and 4 hundred twenty three thousandths times x
A quadrilateral has the following coordinates:
Point A: (4, 7)
Point B: (–4, 7)
Point C: (–4, –7)
Point D: (4, –7)
What is the length of side CD?
Answer:
Step-by-step explanation:
Plz help: what is the probability?
Rolling a number that is less than three 5 times in a row on a number cube labeled 1 through 6
Answer:
whats the options
Answer:
well to me it would be a half and half deal so you might and you might not..
Step-by-step explanation:
PLS help ASAP this really urgent
Answer:
Skewed right.
Step-by-step explanation:
The graph is not symmetric because it's not an exact mirror of each side if you drew a line in the center. If the graph has highpoints on the left side and is leaning down to the right, it's skewed right. Same thing vice versa.
4/9 kilogram of baking soda costs $2. How much does 1 kilogram of baking soda cost?
please drop an explanation, and equation thanks!
Answer:
1 kg of baking soda costs $4.50.
Step-by-step explanation:
Write and solve an equation of ratios, as follows:
4/9 kg $2
------------- = --------------
1 kg x
Multiplying both numerators by 9, we get:
4 kg $18
------------ = ---------
1 kg x
Cross-multiplying, we get 4x kg = $18-kg. Solving for x, we get:
$18-kg
x = -------------- = $4.50
4kg
1 kg of baking soda costs $4.50.
A cylinder has a volume of 24 cubic feet. Which of the following could have the same radius and height as the cylinder?
A. A cone with a volume of 72 cubic feet
B. A cone with a volume of 32 cubic feet
C. A sphere with a volume of 18 cubic feet
D. A cone with a volume of 8 cubic feet
can somebody please help me and explain a little bit? :(
2+2/3 squared Times 63 divided by 9/2
Answer:
5.11111111111 is your answer
Step-by-step explanation:
The taillight of a car is in the shape of a kite whose diagonals are both 15 centimeters. How many square centimeters does the kite occupy?
30
56.25
112.5
225
⚠️MATH QUESTION⚠️ Angle Similarity
Answer:
5 in.
Step-by-step explanation:
If you can see, Triangle ABE has the side with 10 in. and 25 in. on the other side and Triangle FCD has one side with 15 inches, so the bottom one should be 5 in. because decreasing size.
Find the surface area of the square pyramid.
The surface area is square inches.
Answer:
12in
Step-by-step explanation:
Answer:
area of the square pyramid=a²+2al
=5²+(2×5×7)
=25+70
=95in²
Brainiest if correct please help
Answer:
A.
Step-by-step explanation:
Supplementary angles are angles that add up to 180°
<TUS measures 90°
<QUN measures 90°
Both angles added together equals 180°
Which box-and-whisker plot shows the high temperatures in Pittsburgh, Pennsylvania during the first two weeks of March: 33, 45, 42, 47, 35, 45, 41, 34, 44, 34, 48, 40, 43, 45
What is the slope of the line that goes through the points (6, 4) and (8, -2)?
-6
-3
-1/3
3
Answer:
-3
Step-by-step explanation:
(6, 4) and (8, -2)
Slope:
m=(y2-y1)/(x2-x1)
m=( -2 -4)/(8-6)
m = (-6)/2
m = -3
Answer:
-3
Step-by-step explanation:
(6, 4) and (8, -2)
To find the slope of the line, we use the slope formula: (y₂ - y₁) / (x₂ - x₁)
Plug in these values:
(-2 - 4) / (8 - 6)
Simplify the parentheses.
= (-6) / (2)
Simplify the fraction.
-6/2
= -3
This is your slope.
Hope this helps!
The table below gives the price for different numbers of burgers. Do the numbers in the table represent a proportional relationship?
Create an expression that is equivalent to 7x + 4x + x, using the fewest terms
If you answer all these questions for me correctly, you'll get extra points on brainly!
Pepino’s pizza charges $8 for medium pizza plus $2 for each topping. How many toppings are on a medium pizza that costs $20?
Answer:
6 toppings
Step-by-step explanation:
Find how much the toppings cost in total without the medium pizza.
20 - 8 = 12
12 ÷ 2 = 6 toppings
PLEASE HEELP AND THANK YOU
Answer:1/20 to decimal= 0.05 to a percent=5%
Step-by-step explanation: Sorry thats all I know:(
no one get the answer right so i will repost this again
Answer: the rectangle is 5 and the other one is i think 135
Step-by-step explanation:
Pls helppp 3 part question
Simplify write without the absoulute value.
|x-(-12)|, if x<-12
Answer: Hello! The Answer is 0 without the absolute value! Your Welcome! Mark me as Brainliest! :)
Step-by-step explanation:
For the data shown in the scatter plot below, which point is an outlier?
A. (1, 4)
B. (3, 3)
C. (4, 7)
D. (8, 7)
Pls answer ASAP
tysm 30 points!! pls answer correctly
Answer:
The answer is 4 trust me i'm in high school.
Step-by-step explanation:
Plzz mark brainliest