A rectangle has a width that is 3cm less than its length. The perimeter of the rectangle is 22cm. What is the length and width of the rectangle? Please use problem solving algebraically and explain your answer so i can give you the brainliest. :)

Answers

Answer 1

Answer:

The length is 7 and the width is 4

Step-by-step explanation:

l = length

w = l-3

P =2( l+w)

22 = 2( l+ l-3)

Combine like terms

22 = 2(2l-3)

Divide each side by 2

22/2 = 2/2 (2l-3)

11 = 2l-3

Add 3 to each  side

11+3 = 2l-3+3

14 = 2l

Divide each side by 2

14/2 =2l/2

7 = l

Now find w

w = l-3

w = 7-3 = 4

Answer 2

Answer: length = 7 cm

Width = 4 cm

Step-by-step explanation:

Perimeter = 2 (l + w)

22 = 2 ( l + l-3)

22=2 (2l - 3)

22=4l - 6

22+6 = 4l

4l = 28/4

l = 28/1 = 7 = length

Width = 7-3 = 4


Related Questions

Other Questions
Every organization needs some degree of flexibility and standardization. True False Being overly committed to following rules can harm an organization and keep it from growing. True False Every organization needs either a degree of ________ to adapt to new situations or some degree of ________ to make routine tasks and decisions as efficient and effective as possible. standardization; flexibility culture; vision flexibility; standardization structure; design How many grams of LiNO2 are required to make 250 mL of 0.75 Molarity solution? usages of simple present tense and present continuous tense with each example define the general difference between an autotroph and a heterotroph What is the value of x in the equation - 3X+9x+9= 3-37? Which is an example of matter cycling through the bodies of living things?A. Whales swimming in the oceanB. Whales eating planktonC. People visiting the aquariumD. Plankton moving with the tideAnswer: B whales eating plankton Job costing, unit cost, ending work in process. Rowan Company produces pipes for concert-quality organs. Each job is unique. In April 2016, it completed all outstanding orders, and then, in May 2016, it worked on only two jobs, M1 and M2: A B C 1 Rowan Company, May 2016 Job M1 Job M2 2 Direct materials $ 75,000 $ 56,000 3 Direct manufacturing labour 275,000 209,000 Direct manufacturing labour is paid at the rate of $25 per hour. Manufacturing overhead costs are allo- cated at a budgeted rate of $22 per direct manufacturing labour-hour. Only Job M1 was completed in May. Required: 1. Calculate the total cost for Job M1. 2. 1,600 pipes were produced for Job M1. Calculate the cost per pipe. 3. Prepare the journal entry transferring Job M1 to finished goods. 4. What is the ending balance in the Work-in-Process Control account? The slope of a line is 2. The y-intercept of the line is 6. Which statements accurately describe how to graph the function? Locate the ordered pair (0, 6). From that point on the graph, move up 2, right 1 to locate the next ordered pair on the line. Draw a line through the two points. Locate the ordered pair (0, 6). From that point on the graph, move up 2, left 1 to locate the next ordered pair on the line. Draw a line through the two points. Locate the ordered pair (6, 0). From that point on the graph, move up 2, right 1 to locate the next ordered pair on the line. Draw a line through the two points. Locate the ordered pair (6, 0). From that point on the graph, move up 2, left 1 to locate the next ordered pair on the line. Draw a line through the two points. Please answer this correctly