Answer:
While trying to minimize project cost, project manager Ben realized that adjusting the schedule is not completely serving the purpose. What else can ben do to minimize project cost?
In addition to adjusting the schedule, Ben can adjust Everything. For example, the Ben can hire people on contract to reduce costs
Answer:
In addition to adjusting the schedule, Ben can adjust the project team. For example, Ben can hire people on contract to reduce costs.
Explanation:
Employing contract team for the project is another way of reducing the costs. Lack of commitment by the temporary workers needs to be taken into consideration when hiring people on a contract basis. The project's scope contributes to its costs. Therefore, Ben can reduce the scope as part of the efforts to minimize the project's costs.
Credits:
anthougo
Which layer of the iOS architecture is responsible for text and typography?
A. Cocoa Touch layer
B. Media layer
C. Core Services layer
D. Core OS layer
Answer:
b
Explanation:
Its Media layer. its this one
A bookstore owner wants to allow customers to pay for books using their mobile phones. Which version of iOS will support the bookstore’s desired feature?
[iOS 7]/[iOS 8]/[iOS 9] will allow customers to pay for books using their iPhone through an app called [Apple Pay]/[Apple Wallet]/[Apple Passbook]
It's multiple choice.
This isn't really a question, I'm just curious
I have an AORUS 17 YA-9US2452SH 17" Thin Bezel 240Hz FHD IPS LCD, i9-9980HK, RTX 2080 GDDR6 8GB, 32GB DDR4 RAM, M.2 PCIe 1TB SSD, 2TB HDD, Windows 10 Home, Extreme Gaming Laptop.
What do you have? The most impressive Desktop or Laptop gets brainliest
Answer:
apple-1 personal computer original release 1976
Explanation: