Match the example to the model type it represents.
1. The client complains about the way the keyboard feels
1.mock-up
2. The engineering team tests how the tire treads on a new SUV perform on 2.various road conditions
preproduction model
3. The engineering team performs tests on the efficiency of the manufacturing process used for a recumbent bicycle
3.presentation model
Answer:
represnt
Explanation:
Because the mechanism of creep deformation is different from the mechanism of slip in most metal deformation processes, one of the fundamental relationships between microstructure and mechanical properties of metals is reversed for creep deformation compared with normal deformation. Is it:________.
A. The Hume-Rothery Rules
B. The Hall-Petch Relation
C. The Schmid Equation
Answer:
B. The Hall-Petch Relation
Explanation:
The Hall-Petch relation indicates that by reducing the grain size the strength of a material is increased up to the theoretical strength of the material however when the material grain size is reduced below 20 nm the material is more susceptible to creep deformation and displays an "inverse" Hall-Petch Relation as the Hall-Petch relation then has a negative slope (k value)
The Hall-Petch relation can be presented as follows;
[tex]\sigma_y[/tex] = [tex]\sigma_0[/tex] + k·(1/√d)
Where;
[tex]\sigma_y[/tex] = The strength
σ₀ = The friction stress
d = The grain size
k = The strengthening coefficient
The model equation for the reverse Hall-Petch effect is presented here as follows;
[tex]\sigma_y[/tex] = 10.253 - 10.111·(1/√d)
An infinite cylindrical rod falls down in the middle of an infinite tube filled with fluidat a constant speed V (terminal velocity). The density of the rod and the fluid are different.Assume that the pressure field is hydrostatic.(a)[5pts] Solve for the velocity profileas a function of rin terms of V and the other variables.(b)[2pts] Calculate upward force per unit length of the rod from the fluid wall shear stress on the rod.(c)[2 pts] Calculate upward force per unit length of the rod from bouyancy.(d)[1pts] Calculate V.VR1
Answer:
the speed of your poop
Explanation:
Which option identifies the section of a project charter represented in the following scenario?
Updated POS terminals will be available to the following five departments by July 31, 2015.
O project assumptions
O project deliverables
O project constraints
O project requirements