people face health hazards from biological, chemical, physical, and cultural factors every day. read about one of these health hazards, and answer the questions that follow.

Answers

Answer 1

Air pollution is a significant health hazard caused by various biological, chemical, physical, and cultural factors.

What are the health effects of air pollution?

Air pollution, resulting from the release of harmful substances into the atmosphere, poses a range of health hazards. Exposure to pollutants such as particulate matter, nitrogen dioxide, sulfur dioxide, ozone, and carbon monoxide can have adverse effects on human health. These pollutants can penetrate deep into the respiratory system, leading to respiratory problems, including aggravated asthma, bronchitis, and other chronic respiratory diseases. Additionally, air pollution can increase the risk of cardiovascular diseases, such as heart attacks and strokes, as well as contribute to the development of lung cancer.

Long-term exposure to air pollution has been linked to reduced lung function, decreased lung growth in children, and an increased risk of respiratory infections. Moreover, it can exacerbate existing health conditions and impact vulnerable populations such as children, the elderly, and individuals with pre-existing respiratory or cardiovascular diseases.

Learn more about: biological

brainly.com/question/28584322

#SPJ11


Related Questions

The strain gauge is placed on the surface of a thin-walled steel boiler as shown. The gauge is 0.5 in. long and it elongates 0.19(10-3) in. when a pressure is applied. The boiler has a thickness of 0.5in . and inner diameter of60 in. Est = 29(103) ksi, ?st = 0.3. Determine the pressure in the boiler. Determine the maximum x,y in-plane shear strain in the material.

Answers

The pressure in the boiler can be determined by using the formula for stress, which is the force per unit area. In this case, the force is caused by the elongation of the strain gauge, and the area is the cross-sectional area of the boiler.

To determine the pressure, we can use the following steps:

1. Calculate the change in length of the strain gauge:
  Change in length = 0.19(10^-3) in.

2. Calculate the strain in the strain gauge:
  Strain = Change in length / Original length
  Strain = (0.19(10^-3) in.) / (0.5 in.)

3. Calculate the stress in the strain gauge:
  Stress = Strain * Young's modulus
  Stress = Strain * Est

4. Calculate the force on the strain gauge:
  Force = Stress * Cross-sectional area of the strain gauge
  Cross-sectional area of the strain gauge = thickness of the boiler * length of the strain gauge
  Cross-sectional area of the strain gauge = 0.5 in. * 0.5 in.

5. Calculate the pressure in the boiler:
  Pressure = Force / Cross-sectional area of the boiler
  Cross-sectional area of the boiler = π * (inner diameter/2)^2
  Cross-sectional area of the boiler = π * (60 in./2)^2

Now let's calculate the values:

1. Change in length = 0.19(10^-3) in.

2. Strain = (0.19(10^-3) in.) / (0.5 in.)

3. Stress = Strain * Est

4. Cross-sectional area of the strain gauge = 0.5 in. * 0.5 in.

5. Cross-sectional area of the boiler = π * (60 in./2)^2

6. Force = Stress * Cross-sectional area of the strain gauge

7. Pressure = Force / Cross-sectional area of the boiler

Finally, we can determine the maximum x, y in-plane shear strain in the material. The maximum shear strain occurs at a 45-degree angle to the x and y axes. It can be calculated using the formula:
Shear strain = (Change in length / Original length) / 2

In this case, the change in length is already known as 0.19(10^-3) in., and the original length is 0.5 in.
Let's calculate the shear strain:
Shear strain = (0.19(10^-3) in. / 0.5 in.) / 2

Please note that the above calculations are based on the information provided in the question. It's important to double-check the values and formulas used, as well as units, to ensure accuracy.

Learn more about formula for stress at https://brainly.com/question/31729399

#SPJ11

a scuba tank is being designed for an internal pressure of 2640 psi with a factor of safety of 2.0 with respect to yielding. the yield stress of the steel is 65,000 psi in tension and 32,000 psi in shear.

Answers

The scuba tank should be designed to withstand an internal pressure of 2640 psi with a factor of safety of 2.0, considering the yield stress of the steel, which is 65,000 psi in tension and 32,000 psi in shear.

To design a scuba tank that can safely withstand the specified internal pressure, we need to consider the factor of safety and the yield stress of the steel. The factor of safety is a measure of how much stronger the tank is compared to the expected load, and it ensures that the tank can handle unexpected variations or stress concentrations without failure.

Given a factor of safety of 2.0, we can calculate the maximum stress that the tank should experience without yielding. To do this, we divide the yield stress by the factor of safety:

Maximum stress = Yield stress / Factor of safety

For tension, the maximum stress would be 65,000 psi / 2.0 = 32,500 psi, and for shear, it would be 32,000 psi / 2.0 = 16,000 psi.

Therefore, the scuba tank should be designed to withstand a maximum internal pressure of 32,500 psi in tension and 16,000 psi in shear, ensuring that the stresses exerted on the steel do not exceed the yield limits. This design will provide a factor of safety of 2.0, meaning that the tank can handle twice the specified internal pressure before the material starts to yield.

Learn more about Tank

brainly.com/question/12267128

#SPJ11

Other Questions
38. Seleccione la opcin que contenga una fraccin equivalente a la siguiente 2/6 Given f(x)=5x^23x+14, find f(x) using the limit definition of the derivative. f(x)= Here is Takeshi's work determining a third point on the graph of an exponential function, `h(x)`.Explain why the work is incorrect. Use the References to access important values if needed for this question. 1. How many GRAMS of sulfur are present in 2.30 moles of sulfur dioxide, SO2 ? grams 2. How many MOLES of oxygen are present in 3.62 grams of sulfur dioxide? moles ______ listening requires that one put aside all distractions and focus on ones conversational partner in an effort to be supportive, caring, and warm. Find the equation to the statement: The pressure (p) at the bottom of a swimming pool varies directly as the depth (d). which of the following items is prepared at the end of the accounting period immediately before the financial statements are prepared? Calculate the quantity of heat energy in kilojoules required to melt 20.0 g of ice to liquid water at exactly 0C.Hm(H2O)=3.35105 J/kg. A. 6.70103 J B. 6.70106 J C. 1.675104 J D. 3.35102 J E. none of A to D 4: Write the equation of the plane a) passing through points P=(2,1,0),Q=(1,1,1) and R=(0,3,5) b) orthogonal to line l(t)=(2t+1,3t+2,4t) and containing the point P=(3,1,1) Find (f-g)(4) when f(x)=-3x2+2andg(x)=x-4. 9. The consultancy Imagination Inc. is working with its manufacturing client Parts-R-Us to improve their on-time performance. The firm can earn a bonus of up to $1,000,000 based on how much the on-time performance actually improves. It's current (baseline) on-time performance is 90%. The company typically completes approximately 1,000 orders per month, with approximately 100 orders delayed. The bonus payment is prorated according to the following criteria: The on-time performance improvement is calculated based on a reduction in late events or an improvement in on-time performance. No bonus is earned for the first 25% reduction in late events, say from 100 to 75. Maximum bonus is earned once Parts-R-Us achieves 95% on-time performance.Please answer the following:Write down a formula to determine the total bonus amount to be receivedUsing your formula, show how much bonus would be paid if Parts-R-Us achieves 94% on-time performance.Question Title* 10. Formtech Inc. produces transformers. Each order is custom designed and manufactured for the customer. Each order goes through 3 phases:1. Transformer Design, which takes 4 weeks.2. Procurement, which has a lead time of 8 weeks.3. Assembly and Testing, which takes 4 weeks.The design group can handle only 4 projects at any given time. The other groups are not capacity constrained. Please answer the following:How many projects is Formtech able to complete per year?How much total work-in-process (number of projects started but not yet completed) does the company John, an investment adviser, tells Lisa that if she's willing to invest the amount of $100 today, he can increase this investment by 5 times in 5 years. What annual rate of return is John promising on this investment? given a nonhomogeneous system of linear equa- tions, if the system is underdetermined, what are the possibilities as to the number of solutions? Find the number of moles in 6120 ions of NaCl. Round your answer to two decimal places. Input your answer as 1. 03E23, which is the same as 1. 03 x 10^23 Which two types of information should an organization investigate during a background check of a candidate for an is security position? Choose 2 answers Criminal record Credit score Physical health Marital history Find the cosine of the angle between the vectors 6i+k and 9i+j+11k. Use symbolic notation and fractions where needed.) cos = at what step in the filling process do you have the pharmacist resolve medication issues uncovered by the software of drug-drug interactions c. In a high-quality coaxial cable, the power drops by a factor of 10 approximately every 2.75{~km} . If the original signal power is 0.45{~W}\left(=4.5 \times 10^{-1}\right) \ The data owner is most often described by all of the following exceptA. Manager in charge of a business unitB. Ultimately responsible for the protection of the dataC. Financially liable for the loss of the dataD. Ultimately responsible for the use of the data Cost of lodging while traveling to a new home. Mileage on a vehicle used to move household goods. Cost of meals purchased while traveling to a new home. Cost of storage for household goods