Explain two advantages of using critical path analysis when planning production for the car engines (4 marks)

Answers

Answer 1

Answer:

The main benefits of critical path analysis

It demonstrates the graphical view of any project.

It helps to identify the most important tasks that you have to manage.

It helps to save your time and reduce timelines.

It helps to compare planned and actual progress.

It helps to make dependencies visible and clear


Related Questions

please help with my economics problem

Answers

Answer:

You first get a new job, and make a new company and then by amazon to traumatize Jeff Bezos after his divorce

Explanation:

We are given a CSP with only binary constraints. Assume we run backtracking search with arc consistency as follows. Initially, when presented with the CSP, one round of arc consistency is enforced. This first round of arc consistency will typically result in variables having pruned domains. Then we start a backtracking search using the pruned domains. In this backtracking search we use filtering through enforcing arc consistency after every assignment in the search.
Which of the following are true about this algorithm?
a) If after a run of arc consistency during the backtracking searchwe end up with the filtered domains of allof the not yetassigned variables being empty, this means the CSP has nosolution.
b) If after a run of arc consistency during the backtracking searchwe end up with the filtered domain of oneof the not yetassigned variables being empty, this means the CSP has nosolution.
c) None of the above.

Answers

We are given a CSP with only binary can concentrate assume we run backtrackingSearch with ARC

Explain two reason why it is important for DG08 Engineering to refer to electronic component pin configuration specifications when designing and building printed circuit boards?

Answers

Answer:

refer to aja

Explanation:

Write a program that can take a tree as input and travers it in 3 different format (pre-order, in-order and post-order). Write a report, you can follow the attached file. You can modify the report as you want.

Answers

Answer:

Let us see different corner cases.

Complexity function T(n) — for all problem where tree traversal is involved — can be defined as:

T(n) = T(k) + T(n – k – 1) + c

Where k is the number of nodes on one side of root and n-k-1 on the other side.

Let’s do an analysis of boundary conditions

Case 1: Skewed tree (One of the subtrees is empty and other subtree is non-empty )

k is 0 in this case.

T(n) = T(0) + T(n-1) + c

T(n) = 2T(0) + T(n-2) + 2c

T(n) = 3T(0) + T(n-3) + 3c

T(n) = 4T(0) + T(n-4) + 4c

1) Each of the following would be considered company-confidential except
A) a contract bid B) employee salaries C) your company's strategic plan D) your company's address

Answers

Answer is your company’s address

A line of students are arranged in odd and even positions. Now the students in the odd positions are to be sorted in the descending order and the students in the even position are to be sorted in ascending order, given a 1 D array. The maximum length of the line is 20. Display – ‘Invalid Size', if the input specified is zero or negative. Write an algorithm to implement the above scenario.

Answers

Answer:

The algorithm is as follows:

0. Start

1. MyArray = []

2. Input n

3. if n <1 or n > 20:

3.1print("Invalid Size")

4. else:

4.1 for [tex]i = 0[/tex] to n - 1:

 4.1.1 Input MyArray[i]

 4.2 even = []; odd = []

4.3 enum = 0; onum = 0

4.4 for i = 0 to n - 1:

 4.4.1 if i%2 == 0:

  4.4.1.1 even[enum]=list[i]

  4.4.1.2 enum = enum + 1

 4.4.2 else:

  4.4.2.1 odd[onum]=list[i]

  4.4.2.2 onum= onum + 1  

4.5 MyArray.clear()

4.6 enum=0

4.7 while even:

 4.7.1 minm = even[0]

 4.7.2 for x in even:  

  4.7.2.1 if x < minm:

   4.7.2.1.1 minm = x

 4.7.3 MMyArray[enum] = minm

 4.7.4 even.remove(minm)

 4.7.5 enum = enum + 1  

4.8 while odd:

 4.8.1 maxm = odd[0]

 4.8.2 for x in odd:  

  4.8.2.1 if x > maxm:

   4.8.2.1.1 maxm = x

 4.8.3 MMyArray[enum] = maxm

 4.8.4 odd.remove(maxm)

 4.8.5 enum = enum + 1

4.9 for i = 0 to n - 1:

 4.9.1 print MyArray[i]

5. Stop

Explanation:

This starts the algorithm

0. Start

This creates an empty array

1. MyArray = []

This gets input for n (the length of the array)

2. Input n

If n is is less than 1 or greater than 20, then the input is invalid

3. if n <1 or n > 20:

3.1print("Invalid Size")

For valid values of n, we have:

4. else:

The italicized gets input into the array

4.1 for [tex]i = 0[/tex] to n - 1:

 4.1.1 Input MyArray[i]

This creates empty arrays for even index and for odd index

 4.2 even = []; odd = []

This initializes even index and odd index to 0

4.3 enum = 0; onum = 0

This iterates through the array indices

4.4 for i = 0 to n - 1:

If index is even, add array element to even

 4.4.1 if i%2 == 0:

  4.4.1.1 even[enum]=list[i]

  4.4.1.2 enum = enum + 1

If otherwise, add array element to odd

 4.4.2 else:

  4.4.2.1 odd[onum]=list[i]

  4.4.2.2 onum= onum + 1  

Clear elements of MyArray

4.5 MyArray.clear()

Set index to 0

4.6 enum=0

Iterate through the even array

4.7 while even:

Set minimum to the first index

 4.7.1 minm = even[0]

Sort the array in ascending order

 4.7.2 for x in even:  

  4.7.2.1 if x < minm:

   4.7.2.1.1 minm = x

Add the sorted array into MyArray

 4.7.3 MMyArray[enum] = minm

Delete the elements of even array

 4.7.4 even.remove(minm)

 4.7.5 enum = enum + 1  

Iterate through the odd array

4.8 while odd:

Set maximum to the first index

 4.8.1 maxm = odd[0]

Sort the array in descending order

 4.8.2 for x in odd:  

  4.8.2.1 if x > maxm:

   4.8.2.1.1 maxm = x

Add the sorted array into MyArray

 4.8.3 MMyArray[enum] = maxm

Delete the elements of odd array

 4.8.4 odd.remove(maxm)

 4.8.5 enum = enum + 1

Iterate through the indices of the double sorted MyArray

4.9 for i = 0 to n - 1:

Print each array element

 4.9.1 print MyArray[i]

End algorithm

5. Stop

See attachment for the program implemented in Python

An acid-base indicator is usually a weak acid with a characteristic color in the protonated (acid) and deprotonated (conjugate base) forms. In this assignment, you will monitor the color of an acetic acid solution containing Bromocresol Green as an indicator, as the pH is changed and then you will use your data to calculate the ionization constant, Ka, for the bromocresol green indicator and compare to an accepted value.
1. Start Virtual Chemlab, select Acid-Base Chemistry, and then select lonization Constants of Weak Acids from the list of assignments. The lab will open in the Titration laboratory. Bottles of 0.1104 M NaOH and 0.1031 M HAC (acetic acid) will be on the lab bench. The buret will be filled with the NaOH solution and a beaker containing 10.00 mL of the HAc solution will be on the stir plate. The stir plate will be on, Bromocresol Green indicator will have been added to the beaker, and a calibrated pH probe will also be in the beaker so the pH of the solution can be monitored.
2. What is the color and pH of the solution?
3. On the buret, the horizontal position of the orange handle is off for the stopcock. Open the stopcock by pulling down on the orange handle. The vertical position delivers solution the fastest with three intermediate rates in between (slow dropwise, fast dropwise, and slow stream). Turn the stopcock to the second position or fast drop-wise addition. Observe the color of the solution and close the stopcock when you observe the change in color by double clicking on the center of the stopcock.
4. What is the color and pH of the solution now?
5. Continue to add NaOH as before or at a faster rate. What is the final color and pH of the solution after all of the NaOH is added?
6. An acid-base indicator is usually a weak acid with a characteristic color in the protonated and deprotonated forms. Because bromocresol green is an acid, it is convenient to represent its rather complex formula as HBOG. HBOG ionizes in water according to the following equation:
HBOG + H2O = BCG + H3O+
(yellow) (blue)
The K. (the equilibrium constant for the acid) expression is:
Ka = [BCG-][H3O+]/[HBCG)
When [BCG-[ = [HBCG), then Ka = [H3O+). If you know the pH of the solution, then the [H3O+] and Ka can be determined.
What would be the color of the solution if there were equal concentrations of HBCG and BCG-?
What is the pH at the first appearance of this color?
What is an estimate for the Ka for bromocresol green?

Answers

An acid base indicator is usually a weak acid with Terroristic color

Illinois furniture , Inc produces all types of coffee furniture the executive secretary is a chair that has been designed using ergonomics to provide comfort during long work hours the chair sells for $130 there are 480 minutes available during the day and the average daily demand has been 50 chairs there are eight tasks

Answers

This question is incomplete, the complete question is;

Illinois furniture , Inc produces all types of office furniture. The "Executive Secretary" is a chair that has been designed using ergonomics to provide comfort during long work hours the chair sells for $130. There are 480 minutes available during the day and the average daily demand has been 50 chairs. There are eight tasks.

TASK     PERFORMANCE TIME( MIN )     TASK MUST FOLLOW TASK LISTED

A                            4                                                     ---------

B                            7                                                     ----------

C                            6                                                        A,B

D                            5                                                          C

E                            6                                                          D

F                            7                                                           E

G                            8                                                          E

H                            8                                                          F,G

1) What is the cycle time for operation?

2) What is the theoretical minimum number of workstation?

Answer:

1) the cycle time for operation is 9.6 min

2) the theoretical minimum number of workstation is 5

Explanation:

Given the data in the question;

production time per day = 480 minutes

average daily demand = 50

Given the data in the question;

1) cycle time for operation

this is simply referred to as the total time for the process from start to finish.

cycle time = production time per day / units demand per day

we substitute

cycle time = 480 min / 50

cycle time = 9.6 min

Therefore, the cycle time for operation is 9.6 min

2) theoretical minimum number of workstation.

theoretical minimum number of workstation = total task time / cycle time

Total task time = ( 4 + 7 + 6 + 5 + 6 + 7 + 8 + 6 ) = 49 min

∴  theoretical minimum number of workstation = 49 min / 9.6 min

theoretical minimum number of workstation = 5.104 ≈ 5

Therefore, the theoretical minimum number of workstation is 5

Q1) Assuming that in a room full of 13 students born in 2000 and 2004 only, calculate the probability that that two persons or more have the same birthday (same day, month and year) knowing that 2000 contains 366 days and 2004 contains 366 days.

Answers

https://www.uhigh.ilstu.edu/math/thompson/Precalc/Probability%20and%20combinations/9.7%20Probability%20of%20Having%20the%20Same%20Birthday.pdf

Answer:

D

Explanation:

Got it wrong so i could answer

The human eye, as well as the light-sensitive chemicals on color photographic film, respond differently to light sources with different spectral distributions. Daylight lighting corresponds to the spectral distribution of the solar disk, which may be approximated as a blackbody at 5800K. Incandescent lighting from the usual household bulb corresponds approximately to the spectral distribution of a black body at 2900K. Calculate the band emission fractions for the visible region, 0.47 mu m to 0.65 mum, for each of the lighting sources. Calculate the wavelength corresponding to the maximum spectral intensity for each of the light sources

Answers

Answer:

a) at T = 5800 k  

  band emission = 0.2261

at T = 2900 k

  band emission = 0.0442

b) daylight (d) = 0.50 μm

    Incandescent ( i ) =  1 μm

Explanation:

To Calculate the band emission fractions we will apply the Wien's displacement Law

The ban emission fraction in spectral range λ1 to λ2 at a blackbody temperature T can be expressed as

F ( λ1 - λ2, T ) = F( 0 ----> λ2,T) - F( 0 ----> λ1,T )

Values are gotten from the table named: blackbody radiation functions

a) Calculate the band emission fractions for the visible region

at T = 5800 k  

  band emission = 0.2261

at T = 2900 k

  band emission = 0.0442

attached below is a detailed solution to the problem

b)calculate wavelength corresponding to the maximum spectral intensity

For daylight ( d ) = 2898 μm *k / 5800 k  = 0.50 μm

For Incandescent ( i ) = 2898 μm *k / 2900 k = 1 μm

Problem 9.11 A structural component in the form of a wide plate is to be fabricated from a steel alloy that has a plane strain fracture toughness of 92 MPa m (klein.)) and a yield strength of 900 MPa (65270 psi). The flaw size resolution limit of the flaw detection apparatus is 3 mm (0.1181 in.). (a) If the design stress is one-half of the yield strength and the value of Y is 1.15, what is the critical flaw length

Answers

Answer:

the critical flaw length is 10.06 mm

Explanation:

Given the data in the question;

plane strain fracture toughness [tex]K_{tc[/tex] = 92 Mpa√m

yield strength σ[tex]_y[/tex] = 900 Mpa

design stress is one-half of the yield strength ( 900 Mpa / 2 ) 450 Mpa

Y = 1.15

we know that;

Critical crack length [tex]a_c[/tex] = 1/π( [tex]K_{tc[/tex] / Yσ )²

we substitute

[tex]a_c[/tex] = 1/π( 92 Mpa√m / (1.15 × 450 Mpa  )²

[tex]a_c[/tex] = 1/π( 92 Mpa√m / (517.5 Mpa  )²

[tex]a_c[/tex] = 1/π( 0.177777  )²

[tex]a_c[/tex] = 1/π( 0.03160466 )

[tex]a_c[/tex] = 0.01006 m = 10.06 mm

Therefore, the critical flaw length is 10.06 mm

{ [tex]a_c[/tex] = ( 10.06 mm ) > 3 mm

The critical flow is subject to detection

what is the most common type of suspensions system used on body over frame vehicles?

Answers

Answer:

Engine

Explanation:

Semi-independent suspension is the most common type of suspension system used on body over frame vehicles.

What is a Semi-independent suspension?

Semi-independent suspension give the front wheels some individual movement.

This suspension only used in rear wheels.

Thus, the correct option is Semi-independent suspension

Learn more about Semi-independent suspension

https://brainly.com/question/23838001

#SPJ2

In a device to produce drinking water, humid air at 320C, 90% relative humidity and 1 atm is cooled to 50C at constant pressure. If the duty on the unit is 2,200 kW of heat is removed from the humid air, how much water is produced and what is the volumetric flow rate of air entering the unit

Answers

Answer: hello your question lacks some data below is the missing data

Air at 32C has H = 0.204 kJ/mol and at 50C has H = -0.576 kJ/mol

H of steam can be found on the steam tables – vapor at 32C and 1 atm; vapor at 5C and liquid at 5C. Assume the volume of the humid air follows the ideal gas law.

H of water liquid at 5C = 21 kJ/kg; vapor at 5C = 2510.8 kJ/kg; H of water vapor at 32C = 2560.0 kJ/kg

Answer :

a) 34.98 lit/min

b) 1432.53 m^3/min

Explanation:

a) Calculate how much water is produced

density of water = 1 kg/liter

First we will determine the mass of condensed water using the relation below

inlet mass - outlet vapor mass =  0.0339508 * n * 18/1000 ----- ( 1 )

where : n = 57241.57

hence equation 1 = 34.98 Kg/min

∴ volume of water produced =  mass of condensed water / density of water

                                                =  34.98 Kg/min / 1 kg/liter

                                                = 34.98 lit/min

b) calculate the Volumetric flow rate of air entering the unit

applying the relation below

Pv = nRT

101325 *V = 57241.57 * 8.314 * 305  

∴ V = 1432.53 m^3/min

An engineer is testing the shear strength of spot welds used on a construction site. The engineer's null hypothesis at a 5% level of signigicance, is that th mean shear strenfth of spot welds is at least 3.1 MPa. The engineer randomly selcts 15 Welds and measures the shear strength is 3.07 MPa with a sample standard deciation of 0.069 MPa. Which of the following statment is true?
a) The null hypothesis should not be rejected.
b) The null hypothesis should be rejected.
c) The alternate hypothesis should be rejected.
d) The null and alternate hypotheses are equally likely.

Answers

Answer:

b) The null hypothesis should be rejected.

Explanation:

The null hypothesis is  that the mean shear strength of spot welds is at least

3.1 MPa

H0: u ≥3.1 MPa  against the claim Ha: u< 3.1 MPa

The alternate hypothesis is  that the mean shear strength of spot welds is less than 3.1 MPa.

This is one tailed test

The critical region Z(0.05) < ± 1.645

The Sample mean= x`= 3.07

The number of welds= n= 15

Standard Deviation= s= 0.069

Applying z test

z= x`-u/s/√n

z= 3.07-3.1/0.069/√15

z= -0.03/0.0178

z= -1.68

As the calculated z= -1.68  falls in the critical region Z(0.05) < ± 1.645 the null hypothesis is rejected and the alternate hypothesis is accepted that the mean shear strength of spot welds is less than 3.1 MPa

hmmmmmmmm i already put the photo as attachment its

Answers

Answer:

letse see

Explanation:

Which of the following are the same as 1545.5347
Select one:
a. 1.545534e: 3
b. 1545534.0e 4
c0.15455340-5
d. 154553.4e 3

Answers

Explanation:

D the answer is D and anyone can answer this Question

Based on the provided options, the scientific expression that is the same as 1545.5347 is 154553.4e3. Therefore, the correct option is option D.

A scientific expression, often known as scientific notation, is a method of representing extremely big or extremely small integers. It is often used to simplify the representation of such numbers in scientific and mathematical operations. A number is expressed in scientific notation as a product of two parts: a coefficient and a power of ten.

The coefficient is a value between 1 and 10, and the power of 10 determines how far the decimal point should be moved. The "e3" signifies multiplying the integer by 10 raised to the power of 3, which is similar to moving the decimal point three places to the right in this formula. As a result, 154553.4e3 equals 154553.4103, which simplifies to 154553400.

Therefore, the correct option is option D.

To know more about scientific expression, here:

https://brainly.com/question/15361382

#SPJ4

If it took a 30m capacity tank mediated by 2cm waterproof water faucet for 10 hours, calculate the flow speed (exit) water from the

Answers

Complete question:

If it took a 30m³ capacity tank mediated by 2cm waterproof water faucet for 10 hours, calculate the flow speed (exit) of water from the tank.

Answer:

the flow rate of the water from the tank is 0.05 m³/min

Explanation:

Given;

volume of water in the tank, v = 30 m³

length of the waterproof faucet, L = 2cm = 0.02 m

duration of water flow through the tank, t = 10 hours

The flow rate of the water from the tank is calculated as;

[tex]Q = \frac{V}{t} = \frac{30 \ m^3}{10\ h \ \times \ 60 \min} = 0.05 \ m^3/ \min[/tex]

Therefore, the flow rate of the water from the tank is 0.05 m³/min

A 1.00 liter solution contains 0.46 M hydrocyanic acid and 0.35 M potassium cyanide If 25.0 mL of water are added to this system, indicate whether the following statements are true or false. (Note the the volume MUST CHANGE upon the addition of water.)
A. The concentration of HCN will increase.
B. The concentration of CN" will decrease.
C. The equilibrium concentration of Hy0 will remain the same 4
D. The pH will remain the same.
E. The ratio of [HCN]/[CN] will decrease.

Answers

I won leader solution contain 0.46 mL of hydronic I said of 0.3 potassium

banana with an average mass of 0.15 kg and average specific heat of 3.35 kJ/kg · °C is cooled from 20°C to 5°C. The amount of heat transferred from the banana is

a.
62.1 kJ

b.
7.5 kJ

c.
None of these

d.
6.5 kJ

e.
0.85 kJ

f.
17.7 kJ

Answers

Answer:

The amount of heat transferred from the banana is (-)7.54 KJ

Explanation:

As we know,

[tex]Q = m*c*\Delta T[/tex]

Q = Amount of heat transferred

m = mass of banana

[tex]T_2 = 5[/tex] degree Celsius

[tex]T_1 = 20[/tex] degree Celsius

The amount of heat transferred from the banana =

[tex]0.15 * 3.35 * (5 -20)\\-7.54[/tex]KJ (negative sign represents reduction in heat energy)

Please help me answer this engineering question

Answers

https://www.bartleby.com/solution-answer/chapter-26-problem-5sq-electric-motor-control-10th-edition/9781133702818/what-is-meant-by-the-low-or-poor-starting-economy-of-a-primary-resistor-starter/fb257667-8e6f-11e9-8385-02ee952b546e this website has 26 solutions maybe this will help

A tank has a gauge pressure of 552 psi. The cover of an inspection port on the tank has a surface area of 18 square inches. What is the total force the cover is experiencing.

Answers

Answer:

44197.55 N

Explanation:

From the question,

Pressure of the pressure guage (P) = Total force experienced by the cover (F)/Area of the cover (A)

P = F/A................ Equation 1

make F the subeject of the equation

F = P×A............... Equation 2

Given: P = 552 psi = (552×6894.76) = 3805907.52 N/m², A = 18 square inches = (18×0.00064516) = 0.01161288 m²

Substitute these values into equation 2

F = ( 3805907.52×0.01161288)

F = 44197.55 N

What happens to the speed of light if the IOR increases?

Answers

Because index of reflection is defined as the radio between the spray speed of light in a vacuum and the speed of light in a medium as a light traveling to roll the medium increases in speed at index of refraction decreases

A private plane pilot is what kind of individual transportation position? professional level mid-level entry-level EPA-certified

Answers

Answer:

A private plane pilot is a mid-level position.

Explanation:

The six pilot certifications in the US are as follows:

Sport PilotRecreational PilotPrivate Plane PilotCommercial Plane PilotFlight InstructorAirline Transport Pilot

From this listing, it is evident that the Private Plane Pilot is in the mid of the line so it is a mid-level position.

An air conditioning system is to be filled from a rigid container that initially contains 5 kg of saturated liquid at 24° Celsius the valve connecting this container to the air conditioning system is not open until the mass in this container is .25 Cal and the quality is going 506 at which time the valve is closed during this time only saturated liquid R134a flows from the container presuming that the process is isothermal wild the valve is open.

Required:
Determine the final quality of the R-134a in the container and the total heat transfer.

Answers

And air-conditioning system is to be filled for my ridge the containerBut that internally contains 5 kgDetermine the final quality of the arm 134

_____ can be defined as the rate at which work is done or the amount of work done based on a period of time. (2 Points) voltage power resistant current

Answers

Answer: Power

Explanation:

The rate at which work is done or the amount of work done based on a period of time is referred to as power.

Power can also be defined as the amount of energy that is being transferred per unit time. The unit of power is one joule per second or simply called the watt.

Water exiting the condenser of a power plant at 45 Centers a cooling tower with a mas flow rate of 15,000 kg/s. A stream of cooled water is returned to the condenser at the same flowrate. Makeup water is added in a separate stream at 20 C. Atmosphericair enters the cooling tower at 30 C, with a wet bulb temperature of 20 C. The volumetric flow rate of moist air into the cooling tower is 8000 m3/s. Moist air exits the tower at 40C and 90% RH. Assume atmospheric pressure is at 101.3 kPa. Determine: a.T

Answers

Answer: hello your question is incomplete below is the missing part

question :Determine the temperature of the cooled water exiting the cooling tower

answer : T  = 43.477° C

Explanation:

Temp of water at exit = 45°C

mass flow rate of cooling tower = 15,000 kg/s

Temp of makeup water = 20°C

Assuming an atmospheric pressure of = 101.3 kPa

Determine temperature of the cooled water exiting the cooling tower

Water entering cooling tower at 45°C

Given that Latent heat of water at 45°C = 43.13 KJ/mol

Cp(wet air) = 1.005+ 1.884(y1)

where: y1 - Inlet mole ratio = (0.01257) / (1 - 0.01257) = 0.01273

Hence : Cp(wet air) = 29.145 +  (0.01273) (33.94) = 29.577 KJ/kmol°C

First step : calculate the value of Q

Q = m*Cp*(ΔT) + W(latent heat)

Q = 321.6968 (29.577) (40-30) +  43.13 (18.26089)

Q =  95935.8547 KJ/s

Given that mass rate of water = 15000 kg/s

Hence the temperature of the cooled water can be calculated using the equation below

Q = m*Cp*∆T

Cp(water) = 4.2 KJ/Kg°C

95935.8547 = (15000)*(4.2)*(45 - T)

( 45 - T ) = 95935.8547/ 63000.    ∴ T  = 43.477° C

Determine the slopes and deflections at points B and C for the beam shown below by the moment-area method. E=constant=70Gpa I=500 (10^6)mm^4

Answers

Answer:

hello your question is incomplete attached below is the complete question

answer :

Slopes : B = 180 mm , C = 373 mm

Deflection: B = 0.0514 rad ,  C = 0.077 rad

Explanation:

Given data :

I = 500(10^6) mm^4

E = 70 GPa

The M / EI  diagram is attached below

Deflection angle at B

∅B = ∅BA = [ 150 (6) + 1/2 (300)*6 ] / EI

                 = 1800 / ( 500 * 70 ) = 0.0514 rad

slope at B

ΔB = ΔBA = [ 150(6)*3 + 1/2 (300)*6*4 ] / EI

                 = 6300 / ( 500 * 70 ) = 0.18 m = 180 mm

Deflection angle at C

∅C = ∅CA = [ 1800 + 300*3 ] / EI

                 = 2700 / ( 500 * 70 )

                 = 2700 / 35000 = 0.077 rad

Slope at C

ΔC = [ 150 * 6 * 6 + 1/2 (800)*6*7 + 300(3) *1.5 ]

     = 13050 / 35000 = 373 mm

This is the top part of the picture. I need someone to put the correct letter by the word !

Answers

Answer:

J = power steering pump  

A = hydraulic hoses

D = pitman arm

G = rack and pinion assembly

B = idler arm

C = center link

F = tie rod

E = tie rod end

H = rack and pinion boot

I = outer tie rod end

Explanation:

The fracture strength of glass may be increased by etching away a thin surface layer. It is believed that the etching may alter the surface crack geometry (i.e. reduce crack length and increase tip radius). Calculate the ratio of the etched and original crack tip radii if the fracture strength is increased by a factor of 6 when 16.0% of the crack length is removed.

Answers

Answer:

the ratio of the etched to the original crack tip radius is 30.24

Explanation:

Given the data in the question;

we determine the initial fracture stress using the following expression;

(σf)₁ = 2(σ₀)₁ [tex][[/tex] α₁/([tex]p_t[/tex])₁ [tex]]^{1/2[/tex] ----- let this be equation 1

where; (σ₀)₁ is the initial fracture strength

([tex]p_t[/tex])₁ is the original crack tip radius

α₁ is the original crack length.

first, we determine the final crack length;

α₂ = α₁ - 16% of α₁

α₂ = α₁ - ( 0.16 × α₁)

α₂ = α₁ - 0.16α₁

α₂ = 0.84α₁

next, we calculate the final fracture stress;

the fracture strength is increased by a factor of 6;

(σ₀)₂ = 6( σ₀ )₁

Now, expression for the final fracture stress

(σf)₂ = 2(σ₀)₂ [tex][[/tex] α₂/([tex]p_t[/tex])₂ [tex]]^{1/2[/tex] ------- let this be equation 2

where ([tex]p_t[/tex])₂ is the etched crack tip radius

value of fracture stress of glass is constant

Now, we substitute 2(σ₀)₁ [tex][[/tex] α₁/([tex]p_t[/tex])₁ [tex]]^{1/2[/tex] from equation for (σf)₂  in equation 2.

0.84α₁ for α₂.

6( σ₀ )₁ for (σ₀)₂.

2(σ₀)₁ [tex][[/tex] α₁/([tex]p_t[/tex])₁ [tex]]^{1/2[/tex]  = 2(6( σ₀ )₁) [tex][[/tex] 0.84α₁/([tex]p_t[/tex])₂ [tex]]^{1/2[/tex]  

divide both sides by 2(σ₀)₁

[tex][[/tex] α₁/([tex]p_t[/tex])₁ [tex]]^{1/2[/tex]  =  6 [tex][[/tex] 0.84α₁/([tex]p_t[/tex])₂ [tex]]^{1/2[/tex]

[tex][[/tex] 1/([tex]p_t[/tex])₁ [tex]]^{1/2[/tex]  =  6 [tex][[/tex] 0.84/([tex]p_t[/tex])₂ [tex]]^{1/2[/tex]

[tex][[/tex] 1/([tex]p_t[/tex])₁ [tex]][/tex]  =  36 [tex][[/tex] 0.84/([tex]p_t[/tex])₂ [tex]][/tex]

1 / ([tex]p_t[/tex])₁ = 30.24 / ([tex]p_t[/tex])₂

([tex]p_t[/tex])₂ = 30.24([tex]p_t[/tex])₁

([tex]p_t[/tex])₂/([tex]p_t[/tex])₁ = 30.24

Therefore, the ratio of the etched to the original crack tip radius is 30.24

In a production facility, 3-cm-thick large brass plates (k 5 110 W/m·K, r 5 8530 kg/m3, cp 5 380 J/kg·K, and a 5 33.9 3 1026 m2/s) that are initially at a uniform temperature of 25°C are heated by passing them through an oven maintained at 700°C. The plates remain in the oven for a period of 10 min. Taking the convection heat transfer coefficient to be h 5 80 W/m2·K, determine the surface temperature of the plates when they come out of the oven. Solve this problem using analytical one-term approximation method (not the Heisler charts). Can this problem be

Answers

Answer:

the surface temperature of the plates when they come out of the oven is approximately 445 °C

Explanation:

Given the data in the question;

thickness t = 3 cm = 0.03 m

so half of the thickness L = 0.015 m

thermal conductivity of brass k = 110 W/m°C

Density p = 8530 kg/m³

specific heat [tex]C_p[/tex] = 380 J/kg°C

thermal diffusivity of brass ∝ = 33.9 × 10⁻⁶ m²/s

Temperature of oven T₀₀ = 700°C

initial temperature T[tex]_i[/tex] = 25°C

time t = 10 min = 600 s

convection heat transfer coefficient h = 80 W/m².K

Since the plate is large compared to its thickness, the heat conduction is one dimensional. heat transfer coefficient and thermal properties are constant over the entire surface.

So, using analytical one-term approximation method, the Fourier number > 0.2.

now, we determine the Biot number for the process

we know that; Biot number Bi =  hL / k

so we substitute

Bi =  hL / k

Bi = (80 × 0.015) / 110 = 1.2 / 110 = 0.0109

Now, we get the constants λ₁ and A₁ corresponding to Biot Number ( 0.0109 )

The interpolation method used to find the

λ₁ = 0.1039 and A₁ = 1.0018

so

The Fourier number т = ∝t/L²

we substitute

Fourier number т = ( (33.9 × 10⁻⁶)(600) ) / (0.015)²

т = 0.02034 / 0.000225

т = 90.4

As we can see; 90.4 > 0.2

So,  analytical one-term approximation can be used.

∴ Temperature at the surface will be;

θ(L,t)[tex]_{wall[/tex] = (T(x,t) - T₀₀) / (T[tex]_i[/tex] - T₀₀) ----- let this be equation

θ(L,t)[tex]_{wall[/tex] = [A₁e^(-λ₁²т)]cos( λ₁L / L )

so we substitute

θ(L,t)[tex]_{wall[/tex] = [1.0018e^(- (0.1039)²× 90.4 )] cos( 0.1039 × 0.015 / 0.015 )

θ(L,t)[tex]_{wall[/tex] = [1.0018e^(- 0.975886984 )] cos( 0.1039 )

θ(L,t)[tex]_{wall[/tex] = [1.0018 × 0.376857938] × 0.999998

θ(L,t)[tex]_{wall[/tex] = 0.3775

so we substitute into equation 1

θ(L,t)[tex]_{wall[/tex] = (T(L,t) - T₀₀) / (T[tex]_i[/tex] - T₀₀)

0.3775 = ( T(L,t) - 700 ) / ( 25 - 700 )

0.3775 = ( T(L,t) - 700 ) / ( - 675 )

0.3775 × ( - 675 ) = ( T(L,t) - 700 )

- 254.8125 = T(L,t) - 700

T(L,t) = 700 - 254.8125

T(L,t) = 445.1875 °C ≈ 445 °C

Therefore, the surface temperature of the plates when they come out of the oven is approximately 445 °C

Other Questions
Read It!It is not always easy to take a dog for a walk in the dark. Jackie Simoni knows this firsthand. She had fumbled witha flashlight on many walks while holding the leash of her spirited, 90-pound (41-kilogram) golden retriever,Tangent. In 2004, Simoni finally solved this common problem. She invented the PupLight. Puplight attaches to adog's collar. It makes it easier for the dog to be seen. It also lights the way for the owner.Do It!PupLight isA blinkingB convenientC unrealisticD intense Plzzzz Help Matthew is planning to build a right triangular flower bed as shown below. He has set up the flower bed so that the following is true. Which of the following statements about the flower bed is true? Determine whether the graphs of the given equations are parallel, perpendicular, or neither. 24. The first colony established in America wasA. JamestownB. VirginiaC. New YorkD. Roanoke Island The Meiji governments emulation of foreign ways was most directly a response to which of the following nineteenth-century developments?(A) The Qing Empire forcing Japan to accept tributary relations(B) Western states forcing Japan to open itself to trade(C) The Qing Empire requiring Japan to make territorial concessions following the Sino-Japanese War(D) Western states requiring Japan to accept Western advisers at the imperial court following the Opium Wars Place one the selection in each part that corresponds to it. dijetuvieronestuvodijimostuvefuisteisYo (DECIR)Nosotros (DECIR)Ella (ESTAR)Vosotros (SER)Yo (TENER)Ellos (TENER)Find the sentences using Spanish irregular verbs in the past properly (highlight it) Mi amigo deci que hoy es su cumpleaos. (DECIR) Yo hice un pastel para ti. (HACER) (Vos) Fuiste a la fiesta? (IR) Nosotros hacimos muchas cosas ayer. (HACER) T teniste suficiente tiempo para terminar el proyecto. (TENER) Yo era buen estudiante en la universidad. (SER) Yo fui su amigo por mucho tiempo. (SER)Complete these sentences with the correct form of the verbs. You may use a conjugation tool if needed1. Yo no________ terminar la tarea a tiempo. (PODER)2. Qu te pas? Me_____________de la bicicleta. (CAER)3. _________________ lo que pas ayer? (SABER)4. Ellos __________________bastante dinero. (DAR)5. Nosotros no ______________porque ______________ocupados. (1.IR , 2.ESTAR)HELP ME! HELP ME! PLEASE! Can someone tell me which key is the num lock brainliest. here's and update on my song, what do u guys think my teacher will say about this song.drivin' while I'm slidin'you got me in the sky feel like I'm flyin'she hit my line up all the time want me to try thisI got gucci on my belt no I don't hide ityeah we flyin'started from the ghetto now you're risingyou know where where we hidingyou can try it Describe the solution of f(x) shown in the graph.a parabola opening up passing through 0 comma 2, 1 comma zero and 2 comma zero All real solutions All solutions that lie on f(x) All positive solutions All whole number solutionspls answer fast! Write a summary of Romeo and Juliet: A Tragedy? Or Just a Tragic Misunderstanding? A summary is a concise, complete, and accurate overview of a text. It should not include a statement of your opinion or an analysis. A window is 12 feet above the ground. A ladder is placed on the ground to reach the window. If the bottom of the ladder is placed 5 feet away from the building, what is the length of the ladder? explain in your words indigenous knowledge Find the measure of angle ABD. Triangle ABD is an Isosceles Triangle. please say this question answer please help me out please im so confused Is (3,-4) a solution to this system? Read this excerpt from the speech "Cause of the Great War" delivered by British Prime Minister David Lloyd George after World War I. Which statement accurately describes the use of rhetorical devices in this excerpt? We begged Germany not to attack Belgium, and produced a treaty, signed by the King of Prussia, as well as the King of England, pledging himself to protect Belgium against an invader, and we said, "If you invade Belgium we shall have no alternative but to defend it." The enemy invaded Belgium, and now they say, "Why, forsooth, you, England, provoked this war." It is not quite the story of the wolf and the lamb. I will tell you why because Germany expected to find a lamb and found a lion. Help please! No links! In a third grade class, students are measuring each other's heights and recording the data. If they decide to also include their teacher's height, how would this affect the mean of their data? A. It will have no effect on the mean. B. It will increase the mean. C. It will decrease the mean. D. It will remove the mean. What is the difference between a biological and a social view of race? If a cylindrical vessel is 15 cm long and its surface area is 650 cm?, set up anequation to find its radius.