build a 3-bit counter which counts in the following sequence: 0,5,2,7,4,1,6,0. when ce is high on the clock edge the current value of the counter advances to the next number in the counting sequence. so 0,5,2,7,4,1,6,0,5,2,7,4,1,6,0... is the sequence of states this counter will go through when ce is high. when ce is low the counter stays in the same state. you may use only 3 d flip-flops and logic gates. the counter's 3 output bits must come directly from the flip-flops. the counter should also have a tc output which is high at 6 (the last state before the sequence is repeated).

Answers

Answer 1

To create a 3-bit counter that counts in the sequence 0,5,2,7,4,1,6,0, you can use 3 D flip-flops and logic gates. The counter's 3 output bits should come directly from the flip-flops.

On the clock edge, when CE is high, the current value of the counter advances to the next number in the sequence. When CE is low, the counter stays in the same state. Additionally, the counter should have a TC output that is high at 6, which is the last state before the sequence is repeated.

To create this 3-bit counter, you would need to connect the Q outputs from the 3 flip-flops to the inputs of the logic gates. The logic gates would be responsible for generating the next state of the counter based on the current state. For example, when the current state is 0, the logic gates would generate the next state of 5.

Learn more about 3-bit counter

https://brainly.com/question/15564715

#SPJ11


Related Questions

Conduit pip benders are best used with which of the following materials?


THHN wire

Non-metallic sheathed cable

Electrical metallic tubing

Rigid conduit

Answers

Conduit pipe benders are best used with electrical metallic tubing (EMT) and rigid conduit.

Why conduit pipe benders are best used with EMT and rigid conduit only?

These types of conduits are made of metal and require bending to fit around corners and obstacles in electrical installations.

THHN wire and non-metallic sheathed cable, on the other hand, are not typically bent using conduit pipe benders. THHN wire is typically run through conduit, but the conduit itself would be bent, not the wire. Non-metallic sheathed cable, also known as Romex, does not require conduit and is not typically bent during installation.

To learn more about rigid conduit, visit: https://brainly.com/question/30772913

#SPJ1

What are the advantages of regenerative cycle over simple Rankine cycle?

Answers

The regenerative Rankine cycle has a number of advantages over the simple Rankine cycle, such as Higher thermal efficiency, Lower exhaust, and Smaller physical size, Shorter startup time.

Higher thermal efficiency as the steam is recycled back to the boiler, resulting in higher efficiency and better fuel economy. Lower exhaust steam pressure and temperature, making it more suitable for applications with lower temperature differences between the heat source and the sink. Shorter startup time as the turbine does not require as much steam to reach operating conditions. Smaller physical size, as the high pressure and temperature equipment, is not necessary.

To learn more about  Rankine cycle :

https://brainly.com/question/17284733

#SPJ4

There are three car manufacturing factories A,B and C and they are producing the same type of cars.they are employing 1000,2000, and 3000 men and producing 10,15, and 25 cars per month respectively.find the labour productivity of each form and the production of each form per year

Answers

Answer:

  A: 0.010 cars/man·month, 120 cars/year

  B: 0.0075 cars/man·month, 180 cars/year

  C: 0.0083 cars/man·month, 300 cars/year

Explanation:

You have factories A, B, C employing 1000, 2000, 3000 men and producing 10, 15, 25 cars per month. You want to know the productivity and annual production of each factory.

Productivity

Productivity is output per input. In this case, the input is measured in man·months. The output is measured in cars.

  A: 10 cars/(1000 man·months) = 0.010 cars/man·month

  B: 15 cars/(2000 man·months) = 0.0075 cars/man·month

  C: 25 cars/(3000 man·months) ≈ 0.0083 cars/man·month

Production

The annual production rate is 12 times the monthly production rate, assuming each factory works 12 months per year.

  A: 10 cars/mo · 12 mo/yr = 120 cars/yr

  B: 15 cars/mo · 12 mo/yr = 180 cars/yr

  C: 25 cars/mo · 12 mo/yr = 300 cars/yr

assume variables (a, b, c, and max) have been declared. in this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line. if(a > b) {

Answers

Here is the corrected code with comments explaining the changes made to address the syntax and logic errors:

if (a > b) {

   max = a;

} else {

   max = b; // max variable is now initialized or updated properly

}

if (a < 100) {

   if (b < 100) {

       System.out.printf("a and b are both greater than 100\n"); // corrected newline character inside double quotes

   }

}

a = 1; // set a to a positive integer to avoid division by zero error

c = b / a;

if (a == b) { // use double equal signs to compare a with b

   System.out.printf("a and b are equal\n");

}

// added closing curly brace for the outer if statement

The synthesis errors in the code fragment are:

Logic error: Max variable is not initialized or updated properly if a is not greater than b.Syntax error: curly brace is not closed for the inner if statement.Syntax error: missing closing curly brace for the outer if statement.Syntax error: newline character should be inside double quotes in the printf() statement.Logic error: division by zero will occur since a has been set to 0 before the calculation.Logic error: assignment should use double equal signs to compare a with b.Syntax error: missing closing curly brace for the outer if statement.

Learn more about programming:

https://brainly.com/question/26134656

#SPJ11

Question complete:

Assume variables (a,b,c, and max) have been declared. In this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line.

if (a>b)

{

Max=a;//1

}

if(a<100)

{

if (b<100)

{

System.out.printf("gna and b are both greater than1008n"); // \}

}

a=0;

c=b/a;//

if (a=b)

{

 System.out.printf("ona and b are equalzn");

a=a+1;

state which parties will be responsible for the following task in a construction of an earthfall dam for irrigation:
1.Providing labour.
2.Funding the construction of the dam. 3. Approving the drawings
4.Overall coordination of the project.
5.Setting up coordinates and levels for back-filling​

Answers

The parties in the construction of an earthfall dam for irrigation who will be responsible for the following services are given below.

What is the justification for the above response?

Providing labor: The responsibility for providing labor in the construction of an earthfill dam for irrigation will typically fall on the contractor or construction company that has been awarded the contract for the project. The contractor is usually responsible for hiring and managing all the necessary labor, including skilled and unskilled workers, to complete the construction of the dam.

Funding the construction of the dam: The responsibility for funding the construction of the earthfill dam will usually lie with the party or parties that have commissioned the project. In most cases, this will be a government agency or a private company that is investing in the construction of the dam.

Approving the drawings: The responsibility for approving the drawings for the earthfill dam will typically fall on the government agency or private company that is commissioning the project. The drawings will need to be approved by the relevant regulatory bodies and local authorities to ensure that the dam meets all the necessary safety and environmental standards.

Overall coordination of the project: The responsibility for the overall coordination of the project will usually fall on the project manager or project team that has been appointed by the commissioning party. The project manager will be responsible for overseeing all aspects of the project, including managing the budget, scheduling, and ensuring that the construction work is completed to the required standards.

Setting up coordinates and levels for back-filling: The responsibility for setting up the coordinates and levels for back-filling will typically fall on the engineering team that is responsible for the design and construction of the dam. The engineering team will be responsible for surveying the site and determining the best locations for the dam, as well as setting the appropriate coordinates and levels for the back-filling process.

Learn more about construction  at:

https://brainly.com/question/25795065

#SPJ1

Answer:

project manager

Explanation:

3–109E A 0. 083-in-diameter electrical wire at 90°F is covered by 0. 02-in-thick plastic insulation (k = 0. 075 Btu/h·ft·°F). The wire is exposed to a medium at 50°F, with a combined convection and radiation heat transfer coefficient of 2. 5 Btu/h·ft2·°F. Determine if the plastic insulation on the wire will increase or decrease heat transfer from the wire. Answer: It helps

Answers

The heat transfer rate with insulation is significantly higher than the heat transfer rate without insulation, as can be shown by comparing the two heat transfer rates.

Which has the greatest rate of heat transfer?

The table shows that solids (s) generally conduct heat at rates that are significantly higher than those of liquids (l) and gases (g).

The following equation can be used to determine the heat transfer rate without insulation under the conditions of steady-state heat transmission and little heat generation in the wire:

A = pidL A = pi0.0831 = 0.26 square inches. Q = hA(T wire - T inf).

Q = 2.50.26(90 - 50) = 26 Btu/h without insulation R = 0.02 / (0.075×0.26) = 0.98 hrft2°F/Btu

Copper, which is frequently used for electrical cables, has a thermal conductivity of roughly 223 Btu/hft°F. Inputting the values provided yields:

R total = 1 / (2230.26pi×0.0832 / 4) = 0.14 hours/feet/degrees Fahrenheit/Btu

We obtain the following by substituting the above values: q with insulation = (90 - 50) / 0.14 = 286 Btu/h

To know more about heat transfer visit:-

https://brainly.com/question/30772526

#SPJ1

Which of the following questions would be relevant to conducting a building's life-cycle assessment? (Select
all that apply.)

A. What is the cost of the building?
B. Will the building be operated by a foreign-owned corporation?
C. Will the building generate any pollution?
D. How long is the building expected to last?

Answers

The questions that would be relevant to conducting a building's life-cycle assessment? (Select all that apply.)

C. Will the building generate any pollution?

D. How long is the building expected to last?

Building's life-cycle assessment is a comprehensive evaluation of the environmental impacts of a building throughout its entire life cycle, including raw material extraction, transportation, construction, operation, maintenance, renovation, and demolition.

It aims to identify ways to reduce the building's environmental impact and promote sustainability. Relevant factors to consider in a building's life-cycle assessment may include energy efficiency, water usage, waste generation, greenhouse gas emissions, and the use of sustainable materials and practices. Additionally, the expected lifespan of the building is also a crucial factor to consider in the life-cycle assessment as it determines the overall environmental impact of the building over time.

To know more about construction visit:-

brainly.com/question/1888902

#SPJ1

Other Questions
fill in the blank. when you consume extra calories your body doesn't need, the energy can be converted to fat and stored in the adipose cells; as a result, you become fatter because your adipose cells___. Research shows that global managers face a much different leadership context as compared to their domestic counterparts. One study done by Project GLOBE found that culture played a significant role in leadership traits. The study identified six leadership styles: performance-oriented; team-oriented; participative; humane; autonomous; and self-protective.Match each managerial trait and country cluster to the appropriate leadership style. Consider two-sided, one-to-one matching between five men (A, B, C, D, and E) and five women (1,2,3,4, and 5). Their rankings are as follows: Which of the following matchings has no blocking pairs? A:4, B:1, C:3, D:D, E:5, 2:2 A:A, B:5, C:3, D:2, E:1, 4:4 A:4, B:5, C:3, D:2, E:1 A:4, B:1, C:2, D:3, E:5 A:2, B:3, C:5, D:1, E:4 A truck covers 40.0 m in 9.15 s while uniformly slowing down to a final velocity of 2.20 m/s.(b) Find its acceleration.Incorrect: Your answer is incorrect. m/s2 Why did Pirates leave Jamaica in 1689? Please explain to the best of your ability Rae is saving for a new computer, so she's selling her old antivirus software program for $250. Thesoftware originally cost $985, and she used it for 12 years.What was the net asset value of Rae's antivirus software two years after her purchase?O A. $722.50OB. $755OC. $825.75OD. $862.50OE. $890.75 PLease Help The pituitary gland in a male child is malfunctioning. It signals the reproductive organs to secrete hormones too early. Based on your knowledge of the endocrine system and hormones, explain the likely impact of this on the male child. Rewrite the following expressions as adjective phrases. a bus which has forty seats. Why did Hitler and the Nazi party drive the world toward WWII? 8. Calculate the area of the triangle below. A. 25cm B. D. 16cm E. - 12cm 24cm 15cm 8cm 30 C. 20cm In operas, Mozart uses one way to link the music to each of his characters.A. False, Mozart uses three ways to link the music to each of his characters.B. False, Mozart uses many different ways to link the music to each of his characters.C. False, Mozart uses two ways to link the music to each of his characters.D. True pls help fast!! Find the equation of a line perpendicular to 4x+3y=24 that passes through the point (8,3). What is electrical energy? A. The ability to do work.B. The energy of moving electrons.C. The energy of electricity.D. The force of moving atoms. 1. CNS stands for ____________________________________.It includes the brain and ______________________________.2. PNS stands for _________________________________.It includes: ______________________________________.3. How do the CNS and PNS work together?If focusing on the brain (part of the CNS), please complete the following. Remember that these are general areas;more detail could be explored about all of these regions!9. The term brainstem includes the midbrain plus which two structures from the hindbrain?____________________________________________ and ____________________________________________4. What are some functions of themidbrain?7. The hindbrain includes the medulla,____________________, and cerebellum.5. The forebrain includes thecerebrum. What are some functions ofthe cerebrum?6. The forebrain also includes thethalamus and hypothalamus. What aresome functions of these structures?8. What are some functions of the structures listed above?Amoeba Sisters Video Recap: Nervous System10. The PNS can be divided into the autonomic nervous system (ANS) and somaticnervous system (SNS). How do these cartoons at right illustrate some differences betweentheir functions?The ANS can be further divided. You can look at the very first question again to see thedivision flow chart!11. Cartoon 1 at right is representing functions involved in the________________________________________________ system.12. Cartoon 2 at right is representing functions involved in the________________________________________________ system.13. For this image featuring a neuron, please label the:axon, axon terminals, cell body, dendrites, and synapse.14. Many neurons can be myelinated. What does thatmean and what is its significance?15. Neurons can receive a signal in the ______________and carry it down the ____________________________.16. The action potential allows neurons to carry a signalquickly. In 2-4 sentences, briefly summarize what occursin an action potential.17. When an action potential reaches the end of the axon, it can signal synaptic vesicles torelease __________________________________, which can travel the between neuronsand signal an action potential in the neighboring neuron.18. Neurons arent the only cells heavily involved in the nervous system! Glial cells (or glia)have many important roles in the nervous system. What are at least 3 functions of glia? please number and each one 1. How do the movements of sodium and potassium change during the action potential compared to during the resting membrane potential phase? 2. After you stimulate the neuron, why do you have to wait before stimulating it again? 3. Fill in the table below comparing the concentration of sodium and potassium ions inside and outside the cell at the end of the action potential (before it starts to level back out) a car dealership has 5 exterior color choices, 6 interior color choices and 2 model choices. how many different ways can you choose a car what are good websites to include in a climate change seminar? Please help with this please. 2) According to lines 3 and 4, what was the Stamp Act taxing? Wasthere a period in the Shang dynasty history when theyhad a lot of money,power, art, trade, andfood?