1) The critical path of a network is the A) shortest time path through the network. B) path with the fewest activities. C) path with the most activities. D) longest time path through the network. E) None of the above

Answers

Answer 1

Answer:

D

Explanation:

source

https://hbr.org/1963/09/the-abcs-of-the-critical-path-method


Related Questions

what is not an example of a changing operating space?

Answers

What is not an example of a changing operating space? A parking garage. Riley is driving down the highway when the road starts curving to the right.

Parking in garage is not an example of a changing operating space.

What is operating space?

When an operating space is said to be "changing," it usually means that the environment around your car is deteriorating or switching from an open to a closed state.

Operational Spaces are the space(s) inside the Facilities from which the Concessionaire shall have the right, privilege, and obligation to continuously and for the duration of the Term operate its concession in accordance with the terms and conditions of this Agreement.

Distractions while driving, such as texting and using a phone, driving dangerously, such as going too fast or following too closely.

Driving when intoxicated. While drinking and driving is not especially high among novices, it produces a disproportionate number of fatal crashes.

Thus, parking garage is the answer.

For more details regarding operating space, visit:

https://brainly.com/question/9339555

#SPJ6

If you are going to build a custom fast PC for gaming and you need a lot of storage for big video files and videos, but you have a low budget, what storage device(s) option you are going to consider? Why?

Answers

Answer:

Cheap and efficient PC's for two drives

Explanation:

Buying a expensive PC usually runs slower

what is pascaline ?

Answers

Pascal's calculator is a mechanical calculator invented by Blaise Pascal in the mid 17th century. Pascal was led to develop a calculator by the laborious arithmetical calculations required by his father's work as the supervisor of taxes in Rouen.

also called Arithmetic Machine, the first calculator or adding machine to be produced in any quantity and actually used. The Pascaline was designed and built by the French mathematician-philosopher

7.4 Lesson Practice (projectstem): what is output if the user is enters 2?​

Answers

Answer:

18

Explanation:

lets go step by step.

the function called tryIt has a value, a variable named "a". this "a" variable will be whatever the user enters when the program says, Enter a number.

ok so if we enter "a" as 2, and b in the function will always be 7, and 2 + 7 equals 9,

and the ans variable (short for answer) will take the result of the function (9) and multiply it by 2,

then the answer is 18

Software whose code is made freely available to others for use, augmentation, and resale is referred to as:

Answers

Answer:

Open Source Software

Explanation:

You have a server with Windows Server 2016 installed on Disk 0, a basic disk. You're using the server to store users' documents. You have two more disks that you can install in the server. What should you do if you want to provide fault tolerance for users' documents

Answers

Answer:

Convert the new disks to GPT. Create a spanned volume using Disk 1 and Disk 2.

Explanation:

can you still receive messages on messenger from a person when you deleted the conversation with them? (But not blocked them)

Answers

yes cause you didn’t block them

A health care provider approaches Accenture to help them increase their efficiency through an advanced data science platform.What is the first step Accenture could take?

Answers

Accelerating output and hence, growth of an enterprise is one of the core functions of Accenture. Hence, the first step to be taken by Accenture is to design an Enterprise analytic strategy assessment.

Data science leverages the power of collected data combined with simple and complex machine learning algorithm in other to draw pattern and trends from data.

Since, the healthcare provider is a large enterprise, the first step that should be followed would be to design a strategy to the assess the data available to the organization or enterprise

Hence, the first step is to develop an enterprise analytic strategy assessment.

Learn more : https://brainly.com/question/25602226

web browsers save website information in their _________, which helps the site load faster on future visits.

Answers

Answer: cache

Explanation:because I took the quiz

To use the Expression Builder to create a calculated field, select the column in the Field row, right-click to display the shortcut menu, and then click ____.

Answers

Answer:

square brackets [ ]

Explanation:

Hope I could help. Good luck with your studies .

_______ is a medium-range wireless network. ________ is a medium-range wireless network. Cellular radio LTE UWB Wi-Fi

Answers

Wireless fidelity (Wi-Fi) is known simply as a wired LAN that does not have cables. Wifi is a medium-range wireless network.

WiFi configuration is made of of transmitter with an antenna. It is the wireless access point because it connects to a wired LAN or to satellite dishes that gives an Internet connection.

Wi-Fi is the mostly used type of medium-range wireless communication system.

Medium-range Wi-Fi signal can take about 100 meters and they also not take as far as cellular signals.

Learn more from

https://brainly.com/question/20812811

To break a text string into several lines, which means that the text string continues on the next line, the _____ character should be used.

Answers

Answer:

To break a text string into several lines, which means that the text string continues on the next line, the backslash character should be used.

What is the most likely reason for protecting a worksheet?

to track all changes made by editors to a worksheet
to stamp the worksheet with an individual’s information
to prevent email programs from sending the worksheet
to prevent unauthorized users from modifying the worksheet

Answers

Answer: D, to prevent unauthorized users from modifying the worksheet.

Explanation:

Answer:

D. to prevent unauthorized users from modifying the worksheet

Explanation:

hope this helps :)

Memory of your familiar old e-mail password may block the recall of your new password. This illustrates

Answers

Answer:

Retroactive Interference

Explanation:

Memory of your familiar old e-mail password may block the recall of your new password, This illustrates a phenomenon known as proactive interference.

Proactive interference occurs when previously learned information interferes with the recall or retrieval of new information.

The memory of the familiar old e-mail password is interfering with the recall of the new password.

The interference happens because the old password is already deeply ingrained in the individual's memory, and when trying to recall the new password, the old password comes to mind automatically and hinders the retrieval of the correct information.

This interference can lead to forgetting or temporarily blocking the recall of the new password.

To learn more on Proactive interference click:

https://brainly.com/question/30320488

#SPJ6

True or false: The Internet and the World Wide Web are not synonymous. The WWW is just one part of the Internet, and its primary use is to correlate and disseminate information. The Internet includes the WWW and also other forms of communication systems such as email.

Answers

True or false: The Internet and the World Wide Web are not synonymous. The WWW is just one part of the Internet, and its primary use is to correlate and disseminate information. The Internet includes the WWW and also other forms of communication systems such as email.

Answer : True

Which would a student most likely do in a digital laboratory? conduct an experiment in chemistry take continuing education classes in chemistry look for an out-of-print book about chemistry watch an instructional video about chemistry.

Answers

Answer:

conduct an experiment in chemistry

Explanation:

A digital laboratory is an interactive online tool, where students are asked to mimic an experiment.

Answer:

"conduct an experiment in chemistry"

Explanation:

A digital laboratory is an online tool used to conduct chemistry experiments when, say, you are at home or the tools needed are dangerous. It also helps to make sure you have exact results since it is computerized.

Have a nice day!

     I hope this is what you are looking for, but if not - comment! I will edit and update my answer accordingly. (ノ^∇^)

- Heather

1- pensamiento sistémico
2- visión oriental y occidental​

Answers

I don't know

Explanation:

what do you mean?

When using ________ access, access to the data starts at the beginning of the file and proceeds through all the records to the end of the file.

Answers

When using sequential access, access to the data starts at the beginning of the file and proceeds through all the records to the end of the file.

What is a megavirus in computing

Answers

In the lab experiments conducted by Professor Claverie and colleagues, in which they infected fresh-water amoebas, Megavirus was seen to construct large trojan organelles - the "cells within cells" that would produce new viruses to infect other amoebas.

translate ¨friends¨ into spanish

Answers

Friends to Spanish is Amigos

Answer: I hope this is helpful

Explanation:

Friends in Spanish is Amigo- masculine aka male ,noun.
Friend in Spanish is Amiga- feminine aka Female , noun

Friends- trusted and caring person

what was your first pokemon game


if you have not played one just comment don't answer

Answers

Answer:

FireRed & LeafGreen

Explanation:

so if it's mobile games then Pokémon go
but if it's Nintendo games then probably sword and shield cos you can catch pretty much every Pokémon.

who has played pokemon red, blue, or yellow on the gameboy

Answers

Answer:

I didn't think this would be an actual question... I did- :3

I have, it gets harder near the end

According to the C&M Technology Competitor View, while Accenture leads in Consulting and SI, which are our two major competitors in large deals?

Answers

Even though Accenture leads in Consulting and SI, its major competitors include McKinsey and Bain & Co. Inc.

Accenture is a multinational professional technology service company that provides digital, tactical, strategic, and consulting services for its clients.

Accenture was formerly known as Arthur Anderson LLP. It's regarded as one of the top accounting firms in the world. Some of its major competitors in large deals include McKinsey, Bain & Co. Inc., Boston Consulting Group, Inc.

Read related link on:

https://brainly.com/question/25740331

How do i add a picture on a computer? Its a random question but i dont know how to do it. It needs to be a very detailed description.

Answers

get the picture glue it on the screen

principles of Responsible Artificial Intelligence (AI)?

Answers

Answer:

Their principles underscore fairness, transparency and explainability, human-centeredness, and privacy and security.

Explanation:

What is the name of the table tools contextual tab that appears once you insert a table? Transform Design Outline Charts.

Answers

Answer: B.) Design

Explanation: just took it

Answer:

b

Explanation:

Discuss the importance of an operating system as it relates to computer hardware and software. Provide at least one example of a service that operating systems provide.

Answers

Answer:

An operating system is the most important software that runs on a computer. It manages the computer's memory and processes, as well as all of its software and hardware. It also allows you to communicate with the computer without knowing how to speak the computer's language.

Examples:

1. User Interface.

2. Program Execution.

3. File system manipulation.

4. Input / Output Operations.

5. Communication.

6. Resource Allocation.

7. Error Detection.

8. Accounting.

the ____, located near the top of the window, is the control center in excel as well as most other 2019 office applications.

Answers

The ribbon located near the top of the window, is the control center in excel as well as most other 2019 office applications.

Omitted options are  A.Title bar B.Ribbon C.Status bar D.Menu

The Microsoft Excel ribbon like other 2019 office applications is located at the the top of the window and consists of  row of tabs and icons.

This helps a user to easily locate, understand and use commands in order to complete a task.  

The ribbon in Excel is made

tabsgroupsdialog launchers command button

The excel ribbon can also be customized for individual needs.

See here: https://brainly.com/question/23647530

Michelle wants to define the scope of a software development project for the benefit of her company. How does defining the scope of a

software development project help a company?


A It helps communicate effectively with the client

B. It helps deliver a project as per the client's requirements.

C It helps prepare a legal agreement

D. It helps decide the project budget

Answers

Answer:

im pretty sure its A

Explanation:

it makes more sense

Answer:

It helps deliver a project as per the client’s requirements.

Trust me... I took the test

Methods that set values are called ____ methods. Group of answer choices modifier mutator creator access

Answers

Answer:

modifier methods.

Explanation:

Other Questions
Which statement best explains why the sum of the areas of the two white squares in Figure two is the same as the area of the white square in figure one I need someone's help The temperature was -16 degrees at noon. By 2:00 PM it dropped to 10 Degrees. What was the temperature at 2:00 Pm Bengai tigers the population has decreased in india because of what Which Windows Server 2016 core technology provides a single interface for installing, configuring, and removing a variety of server roles and features on your Windows server What unusual characteristic of St. James helped make the visitors feel more welcome? a. The cathedral had no doors to open and close, it was open day and night. B. There were greeters at the doors. C. The cathedral played hymns as new visitors arrived. D. All of the above Please select the best answer from the choices provided A B C D. the ability to keep us while I can focus on the good aspects of the situation is called.... Maximum 500 words.. Develop your unique sales strategies to sell your product or services to a. A community that has NEVER used any of such product. b. A community who has been using your competitors product.please write 500 words please help Answer the following question in 3-4 complete sentences. Describe what a camcorder is and how it has revolutionized video production. A technique that produces multiple tones simultaneously on a wind instrument is called a. multiphonics b. polytonal c. polyphony d. ostinato (Paragraph 35)5.What connection does the author draw between the terminology used to classifytechnology "addictions" and the treatments available to address them? what is ecology and the functions A 400 g ball swings in a vertical circle at the end ofa 1.5-m-long string. When the ball is at the bottomof the circle, the tension in the string is 10 N.A) what is the speed of the ball at that point? Why don't people's cells starve from lack of glucose while they are fasting write two negative command ignore the traffic signal Identify the muscle(s) that is/are primarily responsible for holding the head of the humerus in the glenoid cavity. what types of rocks initially form from deposition? Find the equation of the line. How do you find the answer for 30=6x+20 PLEASE HELP FAST (ALL OF THEM PLESE)